IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

130

matching recommendations
Reset
SIC 3369 Nonferrous Foundries, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0086 # 05 Y:2004 05 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $1,099 $2,050 Implemented
IC0086 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,738 $43,650 Implemented
IC0086 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,905 $2,900 Implemented
AS0345 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,950 $30 Implemented
AS0345 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $519 $3,755 Implemented
AS0345 # 04 Y:2003 04 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,428 $8,500 Implemented
AS0345 # 05 Y:2003 05 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $216 $89 Implemented
AS0345 # 06 Y:2003 06 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $209 $49 Implemented
WI0415 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $3,596 $1,000 Implemented
WI0415 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,252 $1,086 Implemented
WI0415 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $307 $68 Implemented
LM0024 # 01 Y:2002 01 2002 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $7,010 $2,500 Implemented
LM0024 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,154 $3,000 Implemented
LM0024 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,155 $0 Implemented
LM0024 # 05 Y:2002 05 2002 $110,000 $4,500 Implemented
LM0024 # 06 Y:2002 06 2002 $237,600 $0 Implemented
LE0103 # 03 Y:2001 03 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,154 $1,600 Implemented
LE0103 # 04 Y:2001 04 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,904 $12,900 Implemented
LE0103 # 06 Y:2001 06 2001 $17,100 $12,300 Implemented
BD0138 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $31,953 $91,000 Implemented
BD0138 # 04 Y:1999 04 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,839 $4,270 Implemented
BD0138 # 06 Y:1999 06 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $918 $0 Implemented
BD0138 # 08 Y:1999 08 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $630 $800 Implemented
BD0138 # 10 Y:1999 10 1999 MINIMIZE WATER USAGE $766 $1,665 Implemented
BD0138 # 11 Y:1999 11 1999 $139,776 $246,000 Implemented