IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

274

matching recommendations
Reset
SIC 3398 Metal Heat Treating
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2316 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $705 $2,080 Implemented
UW2316 # 02 Y:2023 02 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $73,471 $88,000 Implemented
OR0776 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $1,131 $6,802 Implemented
SD0635 # 04 Y:2023 04 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $22,128 $51,000 Implemented
SD0635 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $541 $1,832 Implemented
SD0635 # 08 Y:2023 08 2023 REPAIR AND ELIMINATE STEAM LEAKS $5,330 $3,125 Implemented
SD0635 # 09 Y:2023 09 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $1,894 $3,900 Implemented
SD0635 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,458 $1,000 Implemented
SD0635 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $77,202 $252,463 Implemented
SD0635 # 06 Y:2023 06 2023 ADJUST BURNERS FOR EFFICIENT OPERATION $10,368 $0 Implemented
OR0766 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,352 $0 Implemented
OR0766 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,610 $0 Implemented
CW0117 # 06 Y:2020 06 2020 USE A DIFFERENT OR RECYCLED RAW MATERIAL $217,090 $846,410 Implemented
CW0117 # 07 Y:2020 07 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,334 $255 Implemented
CW0117 # 05 Y:2020 05 2020 RECYCLE WHITE WATER $2,598 $6,039 Implemented
CW0117 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,860 $6,780 Implemented
CW0117 # 10 Y:2020 10 2020 RECOVER WASTE HEAT FROM EQUIPMENT $879 $5,742 Implemented
CW0117 # 04 Y:2020 04 2020 HEAT WATER WITH EXHAUST HEAT $1,331 $2,149 Implemented
OK1012 # 02 Y:2019 02 2019 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,617 $1,676 Implemented
OK1012 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $4,858 $0 Implemented
OK1012 # 05 Y:2019 05 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $686 $405 Implemented
OK1012 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,564 $12,651 Implemented
OK1012 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,148 $1,560 Implemented
OK0999 # 06 Y:2019 06 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $362 $597 Implemented
OK0999 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $36,593 $39,111 Implemented