Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsSIC | 3398 | Metal Heat Treating |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0225 # 02 Y:1994 | 02 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $13,670 | $15,000 | Implemented |
AM0225 # 01 Y:1994 | 01 | 1994 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $33,100 | $81,000 | Implemented |
AM0225 # 09 Y:1994 | 09 | 1994 | MODIFY MATERIAL APPLICATION METHODS | $0 | $7,500 | Implemented |
AM0225 # 08 Y:1994 | 08 | 1994 | IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) | $0 | $7,500 | Not Implemented |
AM0225 # 07 Y:1994 | 07 | 1994 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $290 | $0 | Implemented |
AM0225 # 06 Y:1994 | 06 | 1994 | USE A RAG RECYCLE SERVICE | $1,440 | $7,900 | Implemented |
AM0225 # 05 Y:1994 | 05 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $730 | $200 | Implemented |
AM0225 # 04 Y:1994 | 04 | 1994 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,260 | $0 | Implemented |
AM0225 # 03 Y:1994 | 03 | 1994 | OPTIMIZE PLANT POWER FACTOR | $10,500 | $13,000 | Not Implemented |
UM0008 # 06 Y:1994 | 06 | 1994 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $11,283 | $7,772 | Not Implemented |
UM0008 # 05 Y:1994 | 05 | 1994 | COVER OPEN TANKS | $8,446 | $4,762 | Not Implemented |
UM0008 # 04 Y:1994 | 04 | 1994 | INSTALL / REPAIR INSULATION ON STEAM LINES | $394 | $157 | Implemented |
UM0008 # 03 Y:1994 | 03 | 1994 | OPTIMIZE PLANT POWER FACTOR | $4,653 | $6,900 | Implemented |
UM0008 # 02 Y:1994 | 02 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $680 | $2,050 | Implemented |
UM0008 # 01 Y:1994 | 01 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,721 | $6,410 | Implemented |
UM0007 # 06 Y:1994 | 06 | 1994 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,570 | $6,179 | Not Implemented |
UM0007 # 05 Y:1994 | 05 | 1994 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,179 | $3,100 | Implemented |
UM0007 # 04 Y:1994 | 04 | 1994 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,032 | $3,000 | Implemented |
UM0007 # 03 Y:1994 | 03 | 1994 | INSTALL OCCUPANCY SENSORS | $1,408 | $570 | Not Implemented |
UM0007 # 02 Y:1994 | 02 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,566 | $19,063 | Implemented |
UM0007 # 01 Y:1994 | 01 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,606 | $8,840 | Implemented |
UM0005 # 08 Y:1994 | 08 | 1994 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $40,230 | $34,000 | Implemented |
UM0005 # 07 Y:1994 | 07 | 1994 | USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC | $17,300 | $6,600 | Implemented |
UM0005 # 06 Y:1994 | 06 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $561 | $200 | Implemented |
UM0005 # 05 Y:1994 | 05 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $986 | $600 | Implemented |