IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

447

matching recommendations
Reset
SIC 3399 Primary Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0377 # 03 Y:2015 03 2015 ELIMINATE/REDUCE AN OPERATION $4,112 $3,576 Implemented
SU0377 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,129 $998 Not Implemented
SU0377 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,883 $2,400 Implemented
SU0377 # 06 Y:2015 06 2015 OPTIMIZE PLANT POWER FACTOR $5,745 $12,259 Not Implemented
SU0377 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,638 $5,256 Implemented
CO0681 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,480 $13,140 Not Implemented
CO0681 # 02 Y:2014 02 2014 INSULATE BARE EQUIPMENT $3,470 $900 Not Implemented
CO0681 # 03 Y:2014 03 2014 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $175,400 $229,810 Implemented
CO0681 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,610 $8,490 Not Implemented
IA0498 # 01 Y:2013 01 2013 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,917 $9,898 Not Implemented
IA0498 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $901 $525 Implemented
IA0498 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $753 $660 Implemented
IA0498 # 04 Y:2013 04 2013 OPTIMIZE PLANT POWER FACTOR $5,092 $3,443 Not Implemented
IA0498 # 05 Y:2013 05 2013 OPTIMIZE PLANT POWER FACTOR $6,316 $3,693 Not Implemented
UA0077 # 01 Y:2012 01 2012 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $17,475 $1,000 Not Implemented
UA0077 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $17,282 $20,463 Not Implemented
UA0077 # 03 Y:2012 03 2012 COVER OPEN TANKS $4,562 $154 Not Implemented
UA0077 # 04 Y:2012 04 2012 USE OPTIMUM THICKNESS INSULATION $880 $913 Not Implemented
UA0077 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,553 $800 Not Implemented
UA0077 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,608 $2,000 Not Implemented
UA0077 # 07 Y:2012 07 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,398 $58 Not Implemented
WV0436 # 01 Y:2011 01 2011 PREHEAT COMBUSTION AIR WITH WASTE HEAT $62,911 $74,268 Not Implemented
WV0436 # 02 Y:2011 02 2011 OPTIMIZE PLANT POWER FACTOR $32,243 $22,700 Not Implemented
WV0436 # 03 Y:2011 03 2011 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $21,604 $29,900 Not Implemented
WV0436 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,837 $45,545 Implemented