IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

397

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0466 # 03 Y:2004 03 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,980 $0 Implemented
AM0466 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,810 $500 Implemented
AM0466 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $790 $215 Implemented
AM0466 # 07 Y:2004 07 2004 PAY UTILITY BILLS ON TIME $600 $0 Implemented
AM0466 # 08 Y:2004 08 2004 USE SYNTHETIC LUBRICANT $279 $0 Implemented
OK0686 # 02 Y:2004 02 2004 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,472 $262 Implemented
OK0686 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $3,350 $1,136 Implemented
OK0686 # 04 Y:2004 04 2004 INSTALL SET-BACK TIMERS $1,577 $1,320 Implemented
OK0686 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,153 $36,618 Implemented
OK0686 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $537 $2,550 Implemented
WV0293 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,117 $20,400 Implemented
WV0293 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,541 $13,500 Implemented
WV0293 # 04 Y:2004 04 2004 DEVELOP A REPAIR/REPLACE POLICY $3,874 $1,250 Implemented
WV0293 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,232 $4,250 Implemented
WV0293 # 09 Y:2004 09 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,889 $210 Implemented
WV0293 # 11 Y:2004 11 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,657 $300 Implemented
UD0694 # 02 Y:2004 02 2004 AIR CONDITION ONLY SPACE NECESSARY $295,125 $0 Implemented
UD0694 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,763 $51,348 Implemented
UD0694 # 06 Y:2004 06 2004 REDUCE VENTILATION AIR $18,999 $0 Implemented
UD0694 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,530 $5,780 Implemented
UD0694 # 10 Y:2004 10 2004 INSTALL OCCUPANCY SENSORS $1,427 $210 Implemented
UD0694 # 11 Y:2004 11 2004 USE RADIANT HEATER FOR SPOT HEATING $883 $1,962 Implemented
UD0694 # 13 Y:2004 13 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $790 $660 Implemented
UD0694 # 14 Y:2004 14 2004 DISCONNECT BALLASTS $393 $13 Implemented
UD0694 # 15 Y:2004 15 2004 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $288 $0 Implemented