IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,430

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0826 # 09 Y:2010 09 2010 INSULATE BARE EQUIPMENT $5,734 $1,600 Implemented
UM0376 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,368 $36,732 Implemented
UM0376 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $7,625 $250 Implemented
UM0376 # 03 Y:2010 03 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,381 $9,416 Implemented
UM0376 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,012 $6,547 Implemented
UM0376 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,793 $200 Implemented
UM0376 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,126 $2,000 Implemented
UM0376 # 07 Y:2010 07 2010 OPTIMIZE PLANT POWER FACTOR $2,850 $2,850 Implemented
UM0376 # 08 Y:2010 08 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $248 $10 Implemented
UM0376 # 09 Y:2010 09 2010 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,943 $2,800 Implemented
UM0376 # 10 Y:2010 10 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $582 $6,500 Implemented
IC0178 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,221 $14,399 Implemented
IC0178 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $1,180 $3,286 Implemented
IC0178 # 05 Y:2010 05 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $754 $4,000 Implemented
IC0178 # 09 Y:2010 09 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,110 $0 Implemented
DL0061 # 03 Y:2010 03 2010 DISCONNECT BALLASTS $655 $5,000 Implemented
DL0061 # 05 Y:2010 05 2010 ADD AREA LIGHTING SWITCHES $23,365 $120 Implemented
DL0061 # 06 Y:2010 06 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $414 $440 Implemented
DL0061 # 10 Y:2010 10 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,529 $47,000 Implemented
DL0061 # 14 Y:2010 14 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,396 $20,804 Implemented
MI0197 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,774 $1,210 Implemented
MI0197 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,187 $180 Implemented
MI0197 # 07 Y:2010 07 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,983 $2,040 Implemented
MZ0052 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,855 $16,700 Implemented
MZ0052 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,361 $18,360 Implemented