IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,255

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0255 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $349 $0 Implemented
UF0255 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $962 $220 Implemented
UF0255 # 06 Y:2000 06 2000 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $511 $0 Implemented
UF0255 # 07 Y:2000 07 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,500 $8,000 Implemented
UF0255 # 08 Y:2000 08 2000 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $178,412 $250,000 Implemented
WI0381 # 02 Y:2000 02 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,183 $4,000 Implemented
WI0381 # 03 Y:2000 03 2000 INSTALL TIMERS AND/OR THERMOSTATS $3,541 $0 Implemented
WI0381 # 04 Y:2000 04 2000 INSTALL AUTOMATIC STACK DAMPER $1,157 $1,000 Implemented
WI0381 # 08 Y:2000 08 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,028 $1,300 Implemented
WI0381 # 12 Y:2000 12 2000 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $124 $300 Implemented
MO0286 # 01 Y:2000 01 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,671 $3,945 Implemented
MO0286 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,521 $118 Implemented
MO0286 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,722 $40 Implemented
MO0286 # 04 Y:2000 04 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $515 $0 Implemented
MO0286 # 06 Y:2000 06 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,040 $0 Implemented
MO0286 # 08 Y:2000 08 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $3,650 $1,300 Implemented
MO0286 # 09 Y:2000 09 2000 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $5,360 $3,700 Implemented
ND0354 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $355 $240 Implemented
ND0354 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $415 $660 Implemented
ND0354 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,533 $14,644 Implemented
ND0354 # 05 Y:2000 05 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,506 $300 Implemented
ND0354 # 06 Y:2000 06 2000 DEVELOP A REPAIR/REPLACE POLICY $8,446 $27,572 Implemented
ND0354 # 07 Y:2000 07 2000 MINIMIZE WATER USAGE $2,685 $6,840 Implemented
ND0354 # 08 Y:2000 08 2000 PAY BILLS ON TIME TO AVOID LATE FEES $1,731 $0 Implemented
IA0249 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $854 $38 Implemented