IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,255

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0465 # 03 Y:2000 03 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,240 $1,210 Implemented
CO0465 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,350 $400 Implemented
CO0465 # 05 Y:2000 05 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $750 $350 Implemented
CO0465 # 06 Y:2000 06 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $4,090 $7,960 Implemented
AS0278 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,407 $120 Implemented
AS0278 # 04 Y:2000 04 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $666 $60 Implemented
AS0278 # 05 Y:2000 05 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $970 $60 Implemented
AR0193 # 03 Y:2000 03 2000 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $2,360 $3,000 Implemented
AR0193 # 04 Y:2000 04 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $553 $653 Implemented
AR0193 # 06 Y:2000 06 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $21,302 $8,000 Implemented
AR0193 # 07 Y:2000 07 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $23,524 $1,000 Implemented
AR0193 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,115 $30 Implemented
SD0249 # 01 Y:2000 01 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $12,372 $25 Implemented
SD0249 # 02 Y:2000 02 2000 UPGRADE CONTROLS ON COMPRESSORS $898 $600 Implemented
ND0349 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,863 $9,787 Implemented
ND0349 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $681 $1,600 Implemented
ND0349 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $917 $50 Implemented
ND0349 # 05 Y:2000 05 2000 USE PHOTOCELL CONTROLS $92 $300 Implemented
ND0349 # 06 Y:2000 06 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $302 $90 Implemented
UD0596 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,200 $27,423 Implemented
UD0596 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $4,221 $1,200 Implemented
DS0164 # 01 Y:2000 01 2000 INSTALL TIMERS AND/OR THERMOSTATS $3,933 $564 Implemented
DS0164 # 02 Y:2000 02 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,164 $806 Implemented
DS0164 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $466 $237 Implemented
DS0164 # 04 Y:2000 04 2000 USE OPTIMUM THICKNESS INSULATION $155 $478 Implemented