IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

255

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0028 # 06 Y:1994 06 1994 AIR CONDITION ONLY SPACE NECESSARY $2,792 $1,000 Implemented
AR0028 # 04 Y:1994 04 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,367 $495 Implemented
AR0028 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,584 $913 Implemented
AR0028 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,490 $7,600 Implemented
AR0028 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,571 $300 Implemented
UM0009 # 11 Y:1994 11 1994 USE RADIANT HEATER FOR SPOT HEATING $8,161 $21,400 Implemented
UM0009 # 10 Y:1994 10 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,829 $1,500 Implemented
UM0009 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,936 $6,420 Implemented
UM0009 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,061 $18,721 Implemented
UM0009 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $262 $800 Implemented
UM0009 # 06 Y:1994 06 1994 COVER OPEN TANKS $4,163 $2,440 Implemented
UM0009 # 09 Y:1994 09 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $930 $196 Implemented
UD0435 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $7,057 $10,000 Implemented
UD0435 # 02 Y:1994 02 1994 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,501 $0 Implemented
OR0209 # 06 Y:1994 06 1994 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $67,700 $260,000 Implemented
OR0209 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $185 $248 Implemented
OR0209 # 04 Y:1994 04 1994 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,640 $2,670 Implemented
OR0209 # 03 Y:1994 03 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $274 $0 Implemented
OR0209 # 02 Y:1994 02 1994 IMPROVE COMBUSTION CONTROL CAPABILITY $27,860 $12,000 Implemented
MS0001 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $124 $33 Implemented
WI0207 # 08 Y:1994 08 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $708 $820 Implemented
WI0207 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,382 $8,346 Implemented
WI0207 # 01 Y:1994 01 1994 RECOVER WASTE HEAT FROM EQUIPMENT $10,556 $6,000 Implemented
MS0001 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $372 $144 Implemented
MS0001 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,165 $3,540 Implemented