IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,215

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0735 # 03 Y:2014 03 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,084 $500 Implemented
MA0735 # 04 Y:2014 04 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,027 $3,000 Implemented
MA0735 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,377 $4,200 Implemented
MZ0154 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,059 $1,260 Implemented
MZ0154 # 06 Y:2014 06 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $383 $850 Implemented
WV0495 # 04 Y:2014 04 2014 INSTALL SET-BACK TIMERS $10,203 $4,200 Implemented
WV0495 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,578 $7,154 Implemented
WV0495 # 06 Y:2014 06 2014 INSULATE BARE EQUIPMENT $5,177 $5,764 Implemented
WV0495 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,890 $5,211 Implemented
WV0495 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,156 $725 Implemented
WV0494 # 02 Y:2014 02 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,532 $51,000 Implemented
WV0494 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $2,592 $1,010 Implemented
WV0494 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,724 $158 Implemented
WV0494 # 05 Y:2014 05 2014 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,708 $6,552 Implemented
WV0494 # 06 Y:2014 06 2014 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,149 $96 Implemented
WV0494 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $511 $1,289 Implemented
WV0494 # 08 Y:2014 08 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $473 $438 Implemented
WV0494 # 10 Y:2014 10 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $371 $1,411 Implemented
OK0890 # 02 Y:2014 02 2014 INSTALL COMMON HEADER ON COMPRESSORS $8,687 $4,800 Implemented
OK0890 # 04 Y:2014 04 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $1,200 $0 Implemented
OK0890 # 05 Y:2014 05 2014 AIR CONDITION ONLY SPACE NECESSARY $6,400 $1,230 Implemented
OK0890 # 06 Y:2014 06 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,700 $0 Implemented
OK0890 # 07 Y:2014 07 2014 USE MINIMUM SAFE OVEN VENTILATION $30,394 $1,000 Implemented
MA0733 # 01 Y:2014 01 2014 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $65,768 $10,000 Implemented
MA0733 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,616 $71,100 Implemented