IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

191

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0404 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,928 $3,189 Implemented
SD0404 # 10 Y:2008 10 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,517 $720 Implemented
LL0291 # 05 Y:2008 05 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $589 $150 Implemented
LL0291 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $180 $105 Implemented
SU0265 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,615 $252 Implemented
SU0265 # 05 Y:2008 05 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $786 $223 Implemented
MA0634 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,014 $119,495 Implemented
MA0634 # 04 Y:2008 04 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,932 $2,500 Implemented
MA0634 # 06 Y:2008 06 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $498 $500 Implemented
SF0362 # 01 Y:2008 01 2008 REPAIR AND ELIMINATE STEAM LEAKS $2,736 $684 Implemented
SF0362 # 03 Y:2008 03 2008 ADD AREA LIGHTING SWITCHES $1,517 $312 Implemented
SF0362 # 04 Y:2008 04 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,745 $1,291 Implemented
SF0362 # 05 Y:2008 05 2008 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $47,707 $15,056 Implemented
SF0362 # 09 Y:2008 09 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $488 $1,566 Implemented
MI0164 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $114,642 $3,960 Implemented
MI0164 # 02 Y:2008 02 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $80,047 $6,886 Implemented
MI0164 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,799 $40 Implemented
MI0164 # 05 Y:2008 05 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $8,597 $4,400 Implemented
MI0164 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,466 $1,032 Implemented
MI0164 # 07 Y:2008 07 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,297 $40 Implemented
MI0164 # 09 Y:2008 09 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,992 $1,032 Implemented
WV0371 # 01 Y:2008 01 2008 ADJUST BURNERS FOR EFFICIENT OPERATION $284,875 $10,157 Implemented
WV0371 # 03 Y:2008 03 2008 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $179,387 $235,000 Implemented
WV0371 # 04 Y:2008 04 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $42,970 $2,500 Implemented
WV0371 # 05 Y:2008 05 2008 DEVELOP A REPAIR/REPLACE POLICY $29,665 $1,823 Implemented