Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
323
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0336 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $31,782 | $11,200 | Implemented |
MZ0336 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $1,963 | $2,020 | Implemented |
MZ0336 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,175 | $53,900 | Implemented |
MZ0320 # 07 Y:2021 | 07 | 2021 | INSTALL OCCUPANCY SENSORS | $279 | $360 | Implemented |
MZ0320 # 04 Y:2021 | 04 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $12,708 | $15,605 | Implemented |
MZ0320 # 02 Y:2021 | 02 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,821 | $240 | Implemented |
MZ0316 # 03 Y:2021 | 03 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $398 | $80 | Implemented |
MZ0316 # 10 Y:2021 | 10 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,220 | $3,485 | Implemented |
MZ0316 # 01 Y:2021 | 01 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,730 | $7,800 | Implemented |
MZ0316 # 07 Y:2021 | 07 | 2021 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $2,786 | $11,055 | Implemented |
MZ0316 # 02 Y:2021 | 02 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,326 | $480 | Implemented |
MZ0316 # 08 Y:2021 | 08 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,866 | $3,614 | Implemented |
MZ0301 # 10 Y:2020 | 10 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,307 | $4,100 | Implemented |
MZ0301 # 08 Y:2020 | 08 | 2020 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $304 | $52 | Implemented |
MZ0301 # 06 Y:2020 | 06 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,087 | $5,000 | Implemented |
MZ0301 # 09 Y:2020 | 09 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $673 | $405 | Implemented |
MZ0301 # 03 Y:2020 | 03 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,820 | $7,000 | Implemented |
MZ0301 # 07 Y:2020 | 07 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $604 | $200 | Implemented |
MZ0301 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,114 | $4,500 | Implemented |
MZ0295 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,599 | $34,694 | Implemented |
MZ0295 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,280 | $550 | Implemented |
MZ0295 # 06 Y:2020 | 06 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,658 | $3,500 | Implemented |
MZ0295 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,272 | $240 | Implemented |
MZ0295 # 09 Y:2020 | 09 | 2020 | INSTALL / REPAIR INSULATION ON STEAM LINES | $675 | $322 | Implemented |
MZ0295 # 08 Y:2020 | 08 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,561 | $360 | Implemented |