Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0184 # 01 Y:2021 | 01 | 2021 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $26,453 | $92,586 | Implemented |
UU0058 # 07 Y:2004 | 07 | 2004 | COMBINE UTILITY METERS | $10,270 | $0 | Implemented |
UU0058 # 06 Y:2004 | 06 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,353 | $0 | Implemented |
UU0058 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,714 | $1,010 | Implemented |
UU0047 # 06 Y:2003 | 06 | 2003 | INSTALL OCCUPANCY SENSORS | $301 | $150 | Implemented |
UU0047 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,044 | $9,000 | Implemented |
UU0047 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,212 | $710 | Implemented |
UU0038 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,673 | $190 | Implemented |
UU0028 # 05 Y:2002 | 05 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $844 | $406 | Implemented |
UU0028 # 06 Y:2002 | 06 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,400 | $2,000 | Implemented |
UU0028 # 04 Y:2002 | 04 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,450 | $700 | Implemented |
UU0028 # 03 Y:2002 | 03 | 2002 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $30,500 | $7,600 | Implemented |
UU0028 # 02 Y:2002 | 02 | 2002 | OPTIMIZE PLANT POWER FACTOR | $5,590 | $9,800 | Implemented |
UU0028 # 01 Y:2002 | 01 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $986 | $0 | Implemented |
UU0008 # 04 Y:2001 | 04 | 2001 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $5,102 | $2,600 | Implemented |
UU0008 # 03 Y:2001 | 03 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,204 | $460 | Implemented |
UU0008 # 02 Y:2001 | 02 | 2001 | USE SYNTHETIC LUBRICANT | $423 | $400 | Implemented |
UU0008 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,523 | $125 | Implemented |
UU0005 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,950 | $280 | Implemented |
UU0005 # 02 Y:2001 | 02 | 2001 | OPTIMIZE PLANT POWER FACTOR | $798 | $932 | Implemented |