IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

176

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0011 # 04 Y:1984 04 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $2,107 $2,290 Implemented
ST0011 # 07 Y:1984 07 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,210 $56 Implemented
MA0012 # 02 Y:1984 02 1984 INSULATE BARE EQUIPMENT $40 $25 Implemented
MA0012 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,078 $100 Implemented
ST0011 # 03 Y:1984 03 1984 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $1,083 $190 Implemented
ST0011 # 06 Y:1984 06 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $93 $45 Implemented
MA0012 # 03 Y:1984 03 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $422 $550 Implemented
ST0011 # 05 Y:1984 05 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $138 $0 Implemented
ST0011 # 09 Y:1984 09 1984 RECOVER WASTE HEAT FROM EQUIPMENT $668 $500 Implemented
ST0011 # 08 Y:1984 08 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $869 $435 Implemented
ST0011 # 01 Y:1984 01 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,259 $0 Implemented
MA0005 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $553 $62 Implemented
MA0005 # 02 Y:1984 02 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $314 $0 Implemented
MA0005 # 03 Y:1984 03 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,993 $200 Implemented
MA0005 # 05 Y:1984 05 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $22,212 $0 Implemented
LT0008 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $380 $300 Implemented
GT0235 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $840 $1,100 Implemented
KU0142 # 01 Y:1984 01 1984 AIR CONDITION ONLY SPACE NECESSARY $94,910 $8,142 Implemented
KU0142 # 05 Y:1984 05 1984 IMPROVE LUBRICATION PRACTICES $12,405 $9,000 Implemented
KU0143 # 05 Y:1984 05 1984 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $4,141 $2,000 Implemented
KU0143 # 04 Y:1984 04 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,586 $3,000 Implemented
LT0008 # 03 Y:1984 03 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $452 $375 Implemented
KU0142 # 03 Y:1984 03 1984 INSTALL TIMERS AND/OR THERMOSTATS $4,724 $0 Implemented
KU0142 # 04 Y:1984 04 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,695 $2,171 Implemented
KU0142 # 02 Y:1984 02 1984 INSTALL TIMERS AND/OR THERMOSTATS $43,246 $0 Implemented