IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

194

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0244 # 02 Y:2017 02 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,898 $46,100 Implemented
MZ0244 # 07 Y:2017 07 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $58,749 $17,550 Implemented
MZ0244 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,371 $0 Implemented
MZ0244 # 06 Y:2017 06 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,568 $2,900 Implemented
MZ0244 # 05 Y:2017 05 2017 USE COMPRESSOR AIR FILTERS $2,071 $900 Implemented
MZ0244 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $150 $280 Implemented
MZ0244 # 01 Y:2017 01 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $20,566 $0 Implemented
UA0186 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,615 $4,645 Implemented
UA0186 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $1,872 $740 Implemented
UA0186 # 05 Y:2017 05 2017 INSTALL TIMERS AND/OR THERMOSTATS $1,297 $60 Implemented
AM0741 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,260 $500 Implemented
AM0741 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,210 $10 Implemented
AM0741 # 04 Y:2017 04 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $560 $160 Implemented
TT0200 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,772 $1,000 Implemented
TT0200 # 02 Y:2017 02 2017 INSTALL TIMERS AND/OR THERMOSTATS $9,558 $46,250 Implemented
MI0325 # 08 Y:2017 08 2017 USE OPTIMUM THICKNESS INSULATION $1,467 $388 Implemented
MI0325 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $979 $3,042 Implemented
MI0325 # 05 Y:2017 05 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $3,801 $160 Implemented
MI0325 # 07 Y:2017 07 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,220 $1,600 Implemented
MI0325 # 06 Y:2017 06 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,645 $2,520 Implemented
MI0325 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,604 $1,660 Implemented
TT0202 # 06 Y:2017 06 2017 DEVELOP A REPAIR/REPLACE POLICY $403 $678 Implemented
TT0202 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,716 $83,867 Implemented
TT0202 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $16,093 $1,430 Implemented
TT0202 # 07 Y:2017 07 2017 INSTALL TIMERS AND/OR THERMOSTATS $197 $100 Implemented