IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

109

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0751 # 02 Y:2022 02 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,956 $1,175 Not Implemented
OR0751 # 01 Y:2022 01 2022 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $12,526 $140 Not Implemented
OR0751 # 04 Y:2022 04 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,125 $1,272 Not Implemented
OR0751 # 03 Y:2022 03 2022 FILTER AND REUSE HYDRAULIC OIL $74,774 $48,589 Not Implemented
OR0692 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,299 $3,670 Not Implemented
OR0692 # 01 Y:2017 01 2017 REDUCE FLUID FLOW RATES $26,801 $7,395 Not Implemented
OR0692 # 02 Y:2017 02 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,636 $3,060 Not Implemented
OR0677 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,583 $22,256 Not Implemented
OR0677 # 03 Y:2016 03 2016 REPLACE BOILER $4,164 $17,322 Not Implemented
OR0677 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,207 $944 Not Implemented
OR0677 # 01 Y:2016 01 2016 INSULATE BARE EQUIPMENT $7,372 $5,408 Implemented
OR0677 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $2,064 $658 Implemented
OR0677 # 02 Y:2016 02 2016 USE OPTIMUM TEMPERATURE $1,822 $300 Not Implemented
OR0529 # 01 Y:2008 01 2008 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $8,800 $4,900 Not Implemented
OR0529 # 04 Y:2008 04 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,767 $4,515 Not Implemented
OR0529 # 03 Y:2008 03 2008 CONTROL PRESSURE ON STEAMER OPERATIONS $11,760 $1,000 Not Implemented
OR0529 # 02 Y:2008 02 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,400 $17,900 Not Implemented
OR0522 # 04 Y:2007 04 2007 $900 $3,450 Not Implemented
OR0522 # 02 Y:2007 02 2007 $49,400 $51,300 Not Implemented
OR0522 # 03 Y:2007 03 2007 $14,500 $10,000 Not Implemented
OR0522 # 01 Y:2007 01 2007 $70,700 $200,000 Not Implemented
OR0454 # 01 Y:2004 01 2004 REDESIGN PROCESS $39,560 $0 Not Implemented
OR0454 # 03 Y:2004 03 2004 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $5,720 $13,080 Implemented
OR0454 # 04 Y:2004 04 2004 USE WATER-BASED CUTTING FLUIDS TO ELIMINATE NEED FOR SOLVENT CLEANING $16,940 $29,200 Implemented
OR0454 # 02 Y:2004 02 2004 INSTALL SENSORS TO DETECT DEFECTS $24,900 $2,600 Not Implemented