IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

436

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0146 # 06 Y:1998 06 1998 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS $2,431 $0 Implemented
TN0639 # 01 Y:1998 01 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $74,290 $26,180 Implemented
TN0639 # 02 Y:1998 02 1998 INSTALL TIMERS AND/OR THERMOSTATS $5,440 $3,440 Implemented
TN0639 # 03 Y:1998 03 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $4,680 $0 Implemented
TN0639 # 04 Y:1998 04 1998 RECOVER AND REUSE WASTE MATERIAL $1,200 $0 Implemented
TN0639 # 05 Y:1998 05 1998 RECOVER WASTE HEAT FROM EQUIPMENT $754 $950 Implemented
TN0639 # 06 Y:1998 06 1998 USE OPTIMUM THICKNESS INSULATION $470 $1,125 Not Implemented
NC0124 # 01 Y:1997 01 1997 AIR CONDITION ONLY SPACE NECESSARY $9,590 $3,000 Implemented
NC0124 # 02 Y:1997 02 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,826 $401 Not Implemented
NC0124 # 03 Y:1997 03 1997 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,715 $15,000 Not Implemented
NC0124 # 04 Y:1997 04 1997 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,906 $6,030 Not Implemented
NC0124 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $790 $270 Implemented
NC0124 # 06 Y:1997 06 1997 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $245 $10 Not Implemented
NC0124 # 07 Y:1997 07 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,913 $6,240 Implemented
NC0124 # 08 Y:1997 08 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,572 $2,000 Implemented
NC0124 # 09 Y:1997 09 1997 MINIMIZE WATER USAGE $2,770 $5,910 Not Implemented
NC0124 # 10 Y:1997 10 1997 IMPLEMENT A MACHINE AND COOLANT SUMP CLEANING PROGRAM TO MINIMIZE COOLANT CONTAMINATION $7,405 $0 Implemented
NC0124 # 11 Y:1997 11 1997 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $2,755 $2,830 Implemented
NC0124 # 12 Y:1997 12 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $375 $200 Not Implemented
NC0124 # 13 Y:1997 13 1997 CLEAR AND RENT EXISTING SPACE $110,000 $15,000 Not Implemented
NC0124 # 14 Y:1997 14 1997 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $12,000 $8,500 Implemented
NC0124 # 15 Y:1997 15 1997 INSTALL MAGAZINES FOR TEMPORARY STORAGE $92,400 $35,000 Implemented
NC0121 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $699 $219 Implemented
NC0121 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $999 $200 Implemented
NC0121 # 03 Y:1997 03 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $90 $250 Implemented