IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

625

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0667 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $670 $760 Not Implemented
OK0667 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $4,471 $1,855 Not Implemented
OK0667 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $931 $185 Not Implemented
OK0667 # 06 Y:2003 06 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $604 $643 Not Implemented
OK0667 # 07 Y:2003 07 2003 INSULATE BARE EQUIPMENT $551 $2,519 Not Implemented
OK0667 # 08 Y:2003 08 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,918 $367 Not Implemented
OK0667 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $652 $5,401 Not Implemented
OK0667 # 10 Y:2003 10 2003 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,803 $500 Not Implemented
OK0667 # 11 Y:2003 11 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,265 $0 Not Implemented
UM0238 # 01 Y:2003 01 2003 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $55,000 $24,610 Not Implemented
UM0238 # 02 Y:2003 02 2003 COVER OPEN TANKS $28,130 $2,624 Implemented
UM0238 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,191 $18,246 Not Implemented
UM0238 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,950 $150 Implemented
UM0238 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $6,485 $8,300 Implemented
UM0238 # 06 Y:2003 06 2003 RECOVER WASTE HEAT FROM EQUIPMENT $3,280 $2,600 Not Implemented
UM0238 # 07 Y:2003 07 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,520 $895 Implemented
UM0238 # 08 Y:2003 08 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $924 $1,000 Not Implemented
UU0047 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,212 $710 Implemented
UU0047 # 02 Y:2003 02 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,536 $4,800 Not Implemented
UU0047 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,044 $9,000 Implemented
UU0047 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,693 $0 Not Implemented
UU0047 # 05 Y:2003 05 2003 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $3,430 $7,126 Not Implemented
UU0047 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $301 $150 Implemented
UU0047 # 07 Y:2003 07 2003 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $4,941 $765 Not Implemented
LL0169 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,185 $1,605 Implemented