IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

347

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0383 # 08 Y:2011 08 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $1,035 $1,207 Not Implemented
UM0383 # 09 Y:2011 09 2011 TREAT AND REUSE RINSE WATERS $60,914 $25,231 Not Implemented
UM0383 # 10 Y:2011 10 2011 HEAT WATER WITH EXHAUST HEAT $101,682 $74,000 Not Implemented
LL0344 # 01 Y:2011 01 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $15,757 $630 Implemented
LL0344 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,150 $1,360 Implemented
LL0344 # 03 Y:2011 03 2011 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,859 $210 Implemented
LL0344 # 04 Y:2011 04 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,425 $575 Implemented
LL0344 # 05 Y:2011 05 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $699 $480 Implemented
LL0344 # 06 Y:2011 06 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $151 $156 Not Implemented
SD0505 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,430 $0 Not Implemented
SD0505 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,022 $2,400 Implemented
SD0505 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,899 $10,561 Not Implemented
SD0505 # 04 Y:2011 04 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,230 $18,098 Not Implemented
SD0505 # 05 Y:2011 05 2011 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $7,773 $17,794 Not Implemented
TT0063 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $339 $0 Not Implemented
TT0063 # 02 Y:2011 02 2011 REPAIR OR REPLACE STEAM TRAPS $6,712 $4,800 Not Implemented
TT0063 # 03 Y:2011 03 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,238 $0 Not Implemented
TT0063 # 04 Y:2011 04 2011 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $900 $1,050 Implemented
TT0063 # 05 Y:2011 05 2011 DEVELOP A REPAIR/REPLACE POLICY $8,057 $30,500 Not Implemented
TT0063 # 06 Y:2011 06 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $12,516 $4,000 Not Implemented
TT0063 # 07 Y:2011 07 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,424 $120 Not Implemented
UD0831 # 01 Y:2011 01 2011 USE SOLAR HEAT TO MAKE ELECTRICTY $28,448 $196,170 Not Implemented
UD0831 # 02 Y:2011 02 2011 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $7,067 $25,796 Not Implemented
UD0831 # 03 Y:2011 03 2011 INSTALL SPECTRAL REFLECTORS / DELAMP $4,392 $3,863 Implemented
UD0831 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $713 $10,495 Implemented