Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
853
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0667 # 02 Y:2003 | 02 | 2003 | RECOVER AND REUSE WASTE MATERIAL | $1,957 | $564 | Not Implemented |
OK0667 # 03 Y:2003 | 03 | 2003 | INSTALL OCCUPANCY SENSORS | $670 | $760 | Not Implemented |
OK0667 # 04 Y:2003 | 04 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,471 | $1,855 | Not Implemented |
OK0667 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $931 | $185 | Not Implemented |
OK0667 # 06 Y:2003 | 06 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $604 | $643 | Not Implemented |
OK0667 # 07 Y:2003 | 07 | 2003 | INSULATE BARE EQUIPMENT | $551 | $2,519 | Not Implemented |
OK0667 # 08 Y:2003 | 08 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,918 | $367 | Not Implemented |
OK0667 # 09 Y:2003 | 09 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $652 | $5,401 | Not Implemented |
OK0667 # 10 Y:2003 | 10 | 2003 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $2,803 | $500 | Not Implemented |
OK0667 # 11 Y:2003 | 11 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,265 | $0 | Not Implemented |
OK0662 # 01 Y:2003 | 01 | 2003 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $832 | $3,222 | Not Implemented |
OK0662 # 02 Y:2003 | 02 | 2003 | INSTALL OCCUPANCY SENSORS | $181 | $300 | Not Implemented |
OK0662 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,135 | $3,289 | Not Implemented |
OK0662 # 04 Y:2003 | 04 | 2003 | INSULATE BARE EQUIPMENT | $406 | $221 | Not Implemented |
OK0662 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $165 | $864 | Not Implemented |
OK0662 # 06 Y:2003 | 06 | 2003 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,326 | $23,100 | n/a |
OK0662 # 07 Y:2003 | 07 | 2003 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,701 | $1,011 | Not Implemented |
OK0662 # 08 Y:2003 | 08 | 2003 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $8,730 | $1,000 | Not Implemented |
OK0653 # 01 Y:2003 | 01 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,530 | $6,844 | Not Implemented |
OK0653 # 02 Y:2003 | 02 | 2003 | USE OPTIMUM THICKNESS INSULATION | $14,697 | $8,210 | Implemented |
OK0653 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,582 | $600 | Not Implemented |
OK0653 # 04 Y:2003 | 04 | 2003 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,904 | $13,860 | Not Implemented |
OK0653 # 05 Y:2003 | 05 | 2003 | INSTALL SET-BACK TIMERS | $5,337 | $3,280 | Not Implemented |
OK0653 # 06 Y:2003 | 06 | 2003 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $25,432 | $4,800 | Not Implemented |
OK0653 # 07 Y:2003 | 07 | 2003 | AUTOMATE FINISHING PROCESS | $36,680 | $73,250 | Not Implemented |