Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,208
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0948 # 05 Y:2016 | 05 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,007 | $926 | Not Implemented |
OK0948 # 06 Y:2016 | 06 | 2016 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $27,228 | $83,600 | Implemented |
OK0948 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,797 | $118,583 | Not Implemented |
OK0948 # 08 Y:2016 | 08 | 2016 | USE OPTIMUM THICKNESS INSULATION | $382 | $1,310 | Implemented |
OK0948 # 09 Y:2016 | 09 | 2016 | USE OPTIMUM THICKNESS INSULATION | $58 | $203 | Implemented |
OK0948 # 10 Y:2016 | 10 | 2016 | USE POWER DURING OFF-PEAK PERIODS | $12,184 | $0 | Not Implemented |
OK0948 # 11 Y:2016 | 11 | 2016 | OPTIMIZE PLANT POWER FACTOR | $7,251 | $25,830 | Implemented |
SU0416 # 01 Y:2016 | 01 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $320 | $0 | Not Implemented |
SU0416 # 02 Y:2016 | 02 | 2016 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,534 | $429 | Implemented |
SU0416 # 03 Y:2016 | 03 | 2016 | ELIMINATE/REDUCE AN OPERATION | $2,385 | $5,280 | Implemented |
SU0416 # 04 Y:2016 | 04 | 2016 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $969 | $2,348 | Implemented |
SU0416 # 05 Y:2016 | 05 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $124 | $418 | Implemented |
SU0416 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,930 | $18,947 | Implemented |
BS0083 # 01 Y:2016 | 01 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $821 | $196 | Not Implemented |
BS0083 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,699 | $982 | Not Implemented |
BS0083 # 03 Y:2016 | 03 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,462 | $3,018 | Not Implemented |
BS0083 # 04 Y:2016 | 04 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $166 | $18 | Not Implemented |
BS0083 # 05 Y:2016 | 05 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $90 | $22 | Not Implemented |
BS0083 # 06 Y:2016 | 06 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $74 | $13 | Not Implemented |
BS0083 # 07 Y:2016 | 07 | 2016 | INSTALL OCCUPANCY SENSORS | $648 | $184 | Not Implemented |
BS0083 # 08 Y:2016 | 08 | 2016 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $75 | $166 | Not Implemented |
BS0083 # 09 Y:2016 | 09 | 2016 | MINIMIZE WATER USAGE | $435 | $250 | Not Implemented |
UD0954 # 01 Y:2016 | 01 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,653 | $42 | Not Implemented |
UD0954 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,397 | $1,000 | Not Implemented |
UD0954 # 03 Y:2016 | 03 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $1,140 | $378 | Not Implemented |