IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

593

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0399 # 10 Y:2015 10 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,750 $20,000 Not Implemented
NC0544 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,734 $100 Implemented
NC0544 # 02 Y:2015 02 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,848 $2,250 Implemented
NC0544 # 03 Y:2015 03 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,316 $2,500 Not Implemented
NC0544 # 04 Y:2015 04 2015 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $4,598 $10,000 Implemented
NC0544 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $579 $2,000 Not Implemented
NC0544 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,344 $3,049 Implemented
NC0544 # 07 Y:2015 07 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,531 $563 Implemented
NC0544 # 08 Y:2015 08 2015 INSTALL OCCUPANCY SENSORS $806 $1,588 Not Implemented
NC0544 # 09 Y:2015 09 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,678 $200 Not Implemented
SD0512 # 01 Y:2015 01 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $34,138 $61,820 Not Implemented
SD0512 # 02 Y:2015 02 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $39,697 $25,608 Implemented
SD0512 # 03 Y:2015 03 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,185 $45,900 Implemented
SD0512 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,532 $800 Implemented
SD0512 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $3,224 $2,850 Implemented
SD0512 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,985 $5,247 Implemented
UD0930 # 01 Y:2015 01 2015 INSTALL OCCUPANCY SENSORS $59,188 $0 Implemented
UD0930 # 02 Y:2015 02 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,352 $0 Implemented
UD0930 # 03 Y:2015 03 2015 USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) $2,426 $300 Not Implemented
UD0930 # 04 Y:2015 04 2015 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $34,411 $5,100 Implemented
UD0930 # 05 Y:2015 05 2015 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $43,664 $10,000 Not Implemented
UD0930 # 06 Y:2015 06 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,067 $17,500 Not Implemented
UD0930 # 07 Y:2015 07 2015 INSTALL COMMON HEADER ON COMPRESSORS $5,330 $1,018 Implemented
UD0930 # 08 Y:2015 08 2015 COVER OPEN TANKS $5,393 $300 Implemented
UD0930 # 09 Y:2015 09 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,032 $19,284 Not Implemented