IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

566

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0554 # 03 Y:1995 03 1995 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,379 $3,800 Implemented
TN0554 # 04 Y:1995 04 1995 RECOVER WASTE HEAT FROM EQUIPMENT $343 $820 Not Implemented
TN0554 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $431 $990 Not Implemented
TN0554 # 06 Y:1995 06 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,625 $0 Implemented
TN0554 # 07 Y:1995 07 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $1,046 $0 Not Implemented
TN0548 # 01 Y:1995 01 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,375 $0 Implemented
TN0548 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,247 $2,300 Implemented
TN0548 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $578 $980 Implemented
TN0548 # 04 Y:1995 04 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $905 $0 Not Implemented
TN0548 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,104 $482 Implemented
TN0547 # 01 Y:1995 01 1995 INSTALL TIMERS AND/OR THERMOSTATS $8,342 $5,800 Implemented
TN0547 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,062 $1,800 Not Implemented
TN0547 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $716 $468 Implemented
TN0547 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $131 $98 Implemented
TN0547 # 05 Y:1995 05 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,135 $0 Not Implemented
TN0538 # 01 Y:1995 01 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,201 $0 Implemented
TN0538 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,149 $0 Not Implemented
TN0538 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,115 $253 Implemented
TN0538 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $471 $810 Not Implemented
TN0538 # 05 Y:1995 05 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $218 $435 Not Implemented
TN0538 # 06 Y:1995 06 1995 OPTIMIZE PLANT POWER FACTOR $4,892 $5,000 Implemented
TN0537 # 01 Y:1995 01 1995 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $16,330 $2,190 Implemented
TN0537 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $2,348 $969 Not Implemented
TN0537 # 03 Y:1995 03 1995 INSULATE BARE EQUIPMENT $464 $950 Not Implemented
TN0537 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $827 $528 Not Implemented