Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,208
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0924 # 07 Y:2015 | 07 | 2015 | INSTALL REPLACEMENT DOORS | $334 | $1,108 | Not Implemented |
OK0924 # 08 Y:2015 | 08 | 2015 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,588 | $1,000 | Not Implemented |
MI0286 # 01 Y:2015 | 01 | 2015 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $19,094 | $29,862 | Implemented |
MI0286 # 02 Y:2015 | 02 | 2015 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $14,710 | $100,350 | Implemented |
MI0286 # 03 Y:2015 | 03 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $12,602 | $80 | Not Implemented |
MI0286 # 04 Y:2015 | 04 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,447 | $6,660 | Not Implemented |
MI0286 # 05 Y:2015 | 05 | 2015 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,778 | $4,691 | Not Implemented |
MI0286 # 06 Y:2015 | 06 | 2015 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $3,819 | $11,872 | Not Implemented |
MI0286 # 07 Y:2015 | 07 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,433 | $5,370 | Not Implemented |
MI0286 # 08 Y:2015 | 08 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,382 | $40 | Not Implemented |
MI0286 # 09 Y:2015 | 09 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $920 | $1,670 | Not Implemented |
SD0520 # 01 Y:2015 | 01 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $43,686 | $162,100 | Implemented |
SD0520 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,173 | $100,875 | Implemented |
SD0520 # 03 Y:2015 | 03 | 2015 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $25,778 | $100,200 | Implemented |
SD0520 # 04 Y:2015 | 04 | 2015 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $13,855 | $24,332 | Implemented |
SD0520 # 05 Y:2015 | 05 | 2015 | INSTALL OCCUPANCY SENSORS | $3,765 | $9,630 | Implemented |
SD0520 # 06 Y:2015 | 06 | 2015 | USE PHOTOCELL CONTROLS | $1,826 | $2,590 | Implemented |
SD0520 # 07 Y:2015 | 07 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $562 | $214 | Implemented |
IA0546 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,361 | $6,263 | Implemented |
IA0546 # 02 Y:2015 | 02 | 2015 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,907 | $7,104 | Implemented |
IA0546 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,451 | $5,839 | Implemented |
IA0546 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,230 | $463 | Implemented |
IA0546 # 05 Y:2015 | 05 | 2015 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $814 | $60 | Implemented |
IA0546 # 06 Y:2015 | 06 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $419 | $539 | Implemented |
IA0546 # 07 Y:2015 | 07 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $229 | $371 | Implemented |