IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

415

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0619 # 05 Y:2022 05 2022 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $20,481 $1,000 Implemented
WV0619 # 06 Y:2022 06 2022 DEVELOP A REPAIR/REPLACE POLICY $14,226 $1,514 Implemented
WV0619 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,611 $45,435 Not Implemented
WV0619 # 08 Y:2022 08 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $11,821 $43,746 Not Implemented
WV0619 # 09 Y:2022 09 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,727 $3,024 Implemented
WV0619 # 10 Y:2022 10 2022 INSULATE BARE EQUIPMENT $5,912 $2,928 Implemented
WV0618 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,096 $10,131 Not Implemented
WV0618 # 02 Y:2022 02 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,969 $4,600 Not Implemented
WV0618 # 03 Y:2022 03 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,452 $1,125 Implemented
WV0618 # 04 Y:2022 04 2022 UPGRADE CONTROLS ON COMPRESSORS $1,409 $3,970 Not Implemented
WV0618 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,089 $525 Implemented
WV0618 # 06 Y:2022 06 2022 DEVELOP A REPAIR/REPLACE POLICY $369 $1,670 Implemented
WV0618 # 07 Y:2022 07 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $354 $90 Implemented
LE0518 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,198 $2,600 Implemented
LE0518 # 02 Y:2022 02 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,190 $4,000 Implemented
LE0518 # 03 Y:2022 03 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,790 $8,800 Implemented
LE0518 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,077 $30,000 Implemented
LE0518 # 05 Y:2022 05 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $45,859 $175,000 Implemented
LE0518 # 06 Y:2022 06 2022 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $114,025 $450,000 Not Implemented
IP0154 # 01 Y:2022 01 2022 PAY BILLS ON TIME TO AVOID LATE FEES $197 $0 Not Implemented
IP0154 # 02 Y:2022 02 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,276 $5,000 Not Implemented
IP0154 # 03 Y:2022 03 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10 $22 Not Implemented
IP0154 # 04 Y:2022 04 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $382 $865 Not Implemented
TT0266 # 01 Y:2022 01 2022 LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD $32,000 $3,900 Implemented
TT0266 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $11,120 $138,300 Not Implemented