IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0511 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,658 $2,000 Not Implemented
SD0511 # 04 Y:2015 04 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,296 $6,475 Not Implemented
SD0511 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $2,105 $1,508 Not Implemented
SD0511 # 06 Y:2015 06 2015 INSULATE BARE EQUIPMENT $812 $2,323 Not Implemented
UD0928 # 01 Y:2015 01 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,389 $0 Not Implemented
UD0928 # 02 Y:2015 02 2015 USE RADIANT HEATER FOR SPOT HEATING $153,677 $48,000 Not Implemented
UD0928 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $314,492 $152,750 Not Implemented
UD0928 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $2,735 $12,995 Not Implemented
UD0928 # 05 Y:2015 05 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $52,184 $105,000 Not Implemented
UD0928 # 06 Y:2015 06 2015 COVER OPEN TANKS $2,876 $2,196 Not Implemented
UD0928 # 07 Y:2015 07 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $154,780 $150,000 Not Implemented
UD0928 # 08 Y:2015 08 2015 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $11,986 $18,300 Not Implemented
UD0928 # 09 Y:2015 09 2015 RECOVER WASTE HEAT FROM EQUIPMENT $12,264 $30,000 Not Implemented
UD0928 # 10 Y:2015 10 2015 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $5,622 $25,000 Not Implemented
UD0928 # 11 Y:2015 11 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,007 $1,000 Not Implemented
UD0928 # 12 Y:2015 12 2015 ADJUST PH FOR NEUTRALIZATION $68,888 $34,000 Not Implemented
UD0927 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,206 $1,000 Not Implemented
UD0927 # 02 Y:2015 02 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,025 $0 Implemented
UD0927 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,022 $300 Implemented
UD0927 # 04 Y:2015 04 2015 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $11,905 $0 Not Implemented
UD0927 # 05 Y:2015 05 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,750 $3,000 Not Implemented
UD0927 # 06 Y:2015 06 2015 COMBINE UTILITY METERS $63,547 $50,000 Not Implemented
UD0927 # 07 Y:2015 07 2015 CONTRACT A WOOD PALLET RECYCLING COMPANY $11,280 $0 Not Implemented
WM0069 # 01 Y:2015 01 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $177,870 $500,000 Not Implemented
WM0069 # 02 Y:2015 02 2015 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $30,131 $24,450 Implemented