IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

568

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0153 # 09 Y:2003 09 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,467 $163 Implemented
SU0153 # 10 Y:2003 10 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $882 $249 Not Implemented
SU0128 # 01 Y:2002 01 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $151 $0 Implemented
SU0128 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $573 $0 Not Implemented
SU0128 # 03 Y:2002 03 2002 PAY BILLS ON TIME TO AVOID LATE FEES $1,088 $0 Implemented
SU0128 # 04 Y:2002 04 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,141 $2,364 Not Implemented
SU0128 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,395 $0 Implemented
SU0128 # 06 Y:2002 06 2002 OPTIMIZE PLANT POWER FACTOR $1,486 $7,000 Not Implemented
SU0128 # 07 Y:2002 07 2002 INSULATE BARE EQUIPMENT $1,502 $1,100 Not Implemented
SU0126 # 01 Y:2002 01 2002 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $195,247 $2,000,000 Not Implemented
SU0126 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $18,512 $3,152 Implemented
SU0126 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,917 $307 Implemented
SU0126 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,232 $1,710 Not Implemented
SU0126 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $777 $0 Not Implemented
SU0119 # 01 Y:2001 01 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,410 $0 Not Implemented
SU0119 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $930 $0 Implemented
SU0119 # 03 Y:2001 03 2001 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $5,956 $4,900 Implemented
SU0119 # 04 Y:2001 04 2001 RECOVER WASTE HEAT FROM EQUIPMENT $2,095 $727 Implemented
SU0119 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $30,661 $208,950 Not Implemented
SU0119 # 06 Y:2001 06 2001 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $46,417 $15,500 Not Implemented
SU0119 # 07 Y:2001 07 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $2,456 $0 Implemented
SU0118 # 01 Y:2001 01 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,949 $30 Not Implemented
SU0118 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $392 $0 Implemented
SU0118 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $120 $158 Not Implemented
SU0118 # 04 Y:2001 04 2001 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $3,469 $16,370 Not Implemented