IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

568

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0118 # 05 Y:2001 05 2001 ELIMINATE SHIFT $20,861 $0 Not Implemented
SU0106 # 01 Y:2001 01 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,051 $0 Implemented
SU0106 # 02 Y:2001 02 2001 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $399,407 $1,400,000 Not Implemented
SU0106 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,947 $2,241 Not Implemented
SU0106 # 04 Y:2001 04 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,158 $500 Implemented
SU0106 # 05 Y:2001 05 2001 OPTIMIZE PLANT POWER FACTOR $3,243 $10,210 Implemented
HO0195 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,672 $9,033 Not Implemented
HO0195 # 02 Y:1999 02 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,258 $150 Not Implemented
HO0195 # 03 Y:1999 03 1999 AIR CONDITION ONLY SPACE NECESSARY $2,914 $0 Not Implemented
HO0195 # 04 Y:1999 04 1999 IMPROVE SPACE COMFORT CONDITIONING $960 $3,000 Not Implemented
HO0195 # 05 Y:1999 05 1999 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $2,496 $5,000 Implemented
HO0195 # 06 Y:1999 06 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $6,240 $340 Not Implemented
HO0195 # 07 Y:1999 07 1999 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $6,192 $5,000 Not Implemented
HO0195 # 08 Y:1999 08 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,248 $2,500 Not Implemented
HO0181 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,163 $10,944 Not Implemented
HO0181 # 02 Y:1998 02 1998 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $88,443 $310,000 Not Implemented
HO0181 # 03 Y:1998 03 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $532 $325 Implemented
HO0181 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $1,232 $1,008 Implemented
HO0181 # 05 Y:1998 05 1998 INSULATE FEEDWATER TANK $227 $72 Implemented
HO0181 # 06 Y:1998 06 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $12,922 $250 Implemented
MA0400 # 01 Y:1997 01 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $347,702 $505,000 Not Implemented
MA0400 # 02 Y:1997 02 1997 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $17,497 $92,676 Not Implemented
MA0400 # 03 Y:1997 03 1997 COVER OPEN TANKS $15,677 $6,578 Implemented
MA0400 # 04 Y:1997 04 1997 INSULATE BARE EQUIPMENT $605 $970 Not Implemented
MA0400 # 05 Y:1997 05 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $388 $0 Implemented