IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0494 # 01 Y:2014 01 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,985 $5,400 Not Implemented
WV0494 # 02 Y:2014 02 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,532 $51,000 Implemented
WV0494 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $2,592 $1,010 Implemented
WV0494 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,724 $158 Implemented
WV0494 # 05 Y:2014 05 2014 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,708 $6,552 Implemented
WV0494 # 06 Y:2014 06 2014 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,149 $96 Implemented
WV0494 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $511 $1,289 Implemented
WV0494 # 08 Y:2014 08 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $473 $438 Implemented
WV0494 # 09 Y:2014 09 2014 DEVELOP A REPAIR/REPLACE POLICY $414 $235 Not Implemented
WV0494 # 10 Y:2014 10 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $371 $1,411 Implemented
OK0890 # 01 Y:2014 01 2014 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $9,580 $770 Not Implemented
OK0890 # 02 Y:2014 02 2014 INSTALL COMMON HEADER ON COMPRESSORS $8,687 $4,800 Implemented
OK0890 # 03 Y:2014 03 2014 INSTALL COMMON HEADER ON COMPRESSORS $1,460 $1,200 Not Implemented
OK0890 # 04 Y:2014 04 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $1,200 $0 Implemented
OK0890 # 05 Y:2014 05 2014 AIR CONDITION ONLY SPACE NECESSARY $6,400 $1,230 Implemented
OK0890 # 06 Y:2014 06 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,700 $0 Implemented
OK0890 # 07 Y:2014 07 2014 USE MINIMUM SAFE OVEN VENTILATION $30,394 $1,000 Implemented
MA0733 # 01 Y:2014 01 2014 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $65,768 $10,000 Implemented
MA0733 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,616 $71,100 Implemented
MA0733 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,971 $1,800 Not Implemented
MA0733 # 04 Y:2014 04 2014 REDUCE VENTILATION AIR $5,225 $7,500 Not Implemented
MA0733 # 05 Y:2014 05 2014 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,595 $13,800 Not Implemented
MA0733 # 06 Y:2014 06 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,532 $3,300 Not Implemented
MA0733 # 07 Y:2014 07 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $906 $1,800 Implemented
MA0733 # 08 Y:2014 08 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $194 $500 Not Implemented