IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

707

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0182 # 02 Y:2000 02 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $351 $0 Implemented
AR0182 # 03 Y:2000 03 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $496 $180 Not Implemented
AR0182 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,868 $130 Implemented
AR0182 # 05 Y:2000 05 2000 PREHEAT COMBUSTION AIR WITH WASTE HEAT $60,765 $150,000 Implemented
AR0182 # 06 Y:2000 06 2000 ELIMINATE LEAKS IN WATER LINES AND VALVES $4,468 $175 Implemented
AR0182 # 07 Y:2000 07 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $222,939 $244,000 Not Implemented
WI0364 # 01 Y:2000 01 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $20,162 $0 Implemented
WI0364 # 02 Y:2000 02 2000 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $7,614 $15,000 Not Implemented
WI0364 # 03 Y:2000 03 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,918 $20,750 Not Implemented
WI0364 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,730 $740 Not Implemented
WI0364 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $489 $90 Not Implemented
WI0364 # 06 Y:2000 06 2000 INSULATE BARE EQUIPMENT $1,567 $3,871 Not Implemented
WI0364 # 07 Y:2000 07 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $594 $438 Not Implemented
BD0153 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,555 $13,420 Implemented
BD0153 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $3,918 $930 Implemented
BD0153 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,648 $1,125 Implemented
BD0153 # 04 Y:2000 04 2000 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $826 $0 Implemented
BD0153 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $245 $235 Not Implemented
BD0153 # 06 Y:2000 06 2000 USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE $1,494 $4,825 Not Implemented
BD0153 # 07 Y:2000 07 2000 MODIFY MATERIAL APPLICATION METHODS $1,171 $1,500 Implemented
BD0153 # 08 Y:2000 08 2000 $7,644 $7,000 Not Implemented
DS0154 # 01 Y:2000 01 2000 INSULATE BARE EQUIPMENT $1,239 $864 Implemented
DS0154 # 02 Y:2000 02 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,609 $10,510 Not Implemented
DS0154 # 03 Y:2000 03 2000 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $2,737 $8,160 Not Implemented
DS0154 # 04 Y:2000 04 2000 RECYCLE CLEANING SOLVENT AND REUSE $18,740 $17,676 Implemented