Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,450
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0306 # 01 Y:2002 | 01 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,205 | $23,000 | Not Implemented |
SD0306 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,006 | $240 | Not Implemented |
SD0306 # 03 Y:2002 | 03 | 2002 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $3,708 | $1,000 | Not Implemented |
SD0306 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,521 | $6,822 | Not Implemented |
SD0306 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,468 | $0 | Implemented |
SD0306 # 06 Y:2002 | 06 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,478 | $5,000 | Not Implemented |
LM0044 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,025 | $625 | Implemented |
LM0044 # 02 Y:2002 | 02 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,530 | $3,825 | Not Implemented |
LM0044 # 03 Y:2002 | 03 | 2002 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $5,678 | $2,120 | Not Implemented |
LM0044 # 04 Y:2002 | 04 | 2002 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $14,885 | $0 | Implemented |
LM0044 # 05 Y:2002 | 05 | 2002 | PURCHASE APPROPRIATELY SIZED MATERIAL | $216,000 | $3,400 | Implemented |
LM0044 # 06 Y:2002 | 06 | 2002 | DEVELOP STANDARD OPERATING PROCEDURES | $159,315 | $6,792 | Not Implemented |
LM0044 # 07 Y:2002 | 07 | 2002 | MODIFY STARTUP/SHUTDOWN TIMES | $5,695 | $300 | Not Implemented |
SD0302 # 01 Y:2002 | 01 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,323 | $34,000 | Not Implemented |
SD0302 # 02 Y:2002 | 02 | 2002 | INSTALL SKYLIGHTS | $6,262 | $2,000 | Not Implemented |
SD0302 # 03 Y:2002 | 03 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,968 | $12,000 | Not Implemented |
SD0302 # 04 Y:2002 | 04 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,228 | $0 | Not Implemented |
SD0302 # 05 Y:2002 | 05 | 2002 | INSTALL OCCUPANCY SENSORS | $964 | $800 | Not Implemented |
SD0302 # 06 Y:2002 | 06 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $5,000 | $10,000 | Not Implemented |
SD0302 # 07 Y:2002 | 07 | 2002 | USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS | $5,210 | $6,000 | Not Implemented |
SD0302 # 08 Y:2002 | 08 | 2002 | PAY UTILITY BILLS ON TIME | $427 | $0 | Implemented |
LM0040 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,685 | $450 | Not Implemented |
LM0040 # 02 Y:2002 | 02 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,048 | $600 | Not Implemented |
LM0040 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,476 | $288 | Implemented |
LM0040 # 04 Y:2002 | 04 | 2002 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,360 | $1,440 | Not Implemented |