IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,436

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0003 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,862 $0 Implemented
LM0003 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,731 $460 Implemented
LM0003 # 04 Y:2001 04 2001 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $2,824 $0 Implemented
LM0003 # 05 Y:2001 05 2001 MAINTAIN MACHINES TO REDUCE LEAKS $750 $350 Implemented
LM0003 # 06 Y:2001 06 2001 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $7,268 $1,500 Not Implemented
LM0002 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,192 $3,285 Not Implemented
LM0002 # 02 Y:2001 02 2001 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,259 $3,158 Not Implemented
LM0002 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,253 $250 Implemented
LM0002 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $508 $0 Implemented
LM0002 # 05 Y:2001 05 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,282 $12,475 Not Implemented
LM0002 # 06 Y:2001 06 2001 USE ULTRASONIC CLEANING $100,100 $90,000 Not Implemented
LM0002 # 07 Y:2001 07 2001 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $128,500 $0 Implemented
SD0272 # 01 Y:2001 01 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $22,159 $5,200 Implemented
SD0272 # 02 Y:2001 02 2001 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $24,052 $18,000 Not Implemented
SD0272 # 03 Y:2001 03 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $54,857 $120,000 Implemented
SD0272 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,213 $400 Implemented
SD0272 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,172 $7,600 Implemented
SD0272 # 06 Y:2001 06 2001 RECOVER WASTE HEAT FROM EQUIPMENT $2,078 $2,000 Implemented
SD0272 # 07 Y:2001 07 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,318 $2,550 Not Implemented
SD0272 # 08 Y:2001 08 2001 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $1,288,713 $1,830,400 Not Implemented
SD0272 # 09 Y:2001 09 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,638 $15,000 Not Implemented
SD0272 # 10 Y:2001 10 2001 AUTOMATE FINISHING PROCESS $196,800 $56,000 Not Implemented
SF0213 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,492 $0 Implemented
SF0213 # 02 Y:2001 02 2001 INSULATE BARE EQUIPMENT $19,198 $3,152 Not Implemented
SF0213 # 03 Y:2001 03 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,282 $950 Not Implemented