IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,156

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0209 # 01 Y:2002 01 2002 INSTALL OCCUPANCY SENSORS $3,063 $1,050 Not Implemented
BD0209 # 02 Y:2002 02 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,724 $2,550 Not Implemented
BD0209 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $977 $600 Not Implemented
BD0209 # 04 Y:2002 04 2002 USE RADIANT HEATER FOR SPOT HEATING $704 $2,700 Implemented
BD0209 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $676 $0 Not Implemented
BD0209 # 06 Y:2002 06 2002 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $540 $750 Not Implemented
BD0209 # 07 Y:2002 07 2002 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $210 $300 Not Implemented
BD0209 # 08 Y:2002 08 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $165,828 $350,000 Not Implemented
SD0293 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,804 $52,000 Implemented
SD0293 # 02 Y:2002 02 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,322 $3,700 Implemented
SD0293 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $5,121 $1,000 Implemented
SD0293 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,238 $280 Implemented
SD0293 # 05 Y:2002 05 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $2,851 $4,092 Not Implemented
SD0293 # 06 Y:2002 06 2002 INCREASE USE OF AUTOMATION $122,000 $45,000 Not Implemented
SD0293 # 07 Y:2002 07 2002 PAY UTILITY BILLS ON TIME $417 $0 Not Implemented
WI0418 # 01 Y:2002 01 2002 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $151,650 $60,000 Not Implemented
WI0418 # 02 Y:2002 02 2002 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $104,205 $715,000 n/a
WI0418 # 03 Y:2002 03 2002 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $65,100 $150,000 n/a
WI0418 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,681 $8,775 Not Implemented
WI0418 # 05 Y:2002 05 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,487 $15,000 n/a
WI0418 # 06 Y:2002 06 2002 INSTALL OCCUPANCY SENSORS $870 $150 Implemented
WI0418 # 07 Y:2002 07 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $850 $0 Not Implemented
WI0418 # 08 Y:2002 08 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,492 $630 Not Implemented
LM0030 # 01 Y:2002 01 2002 INSULATE BARE EQUIPMENT $35,921 $34,056 Not Implemented
LM0030 # 02 Y:2002 02 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $341,748 $600,000 Not Implemented