IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,139

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0285 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $806 $237 Not Implemented
IA0285 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $449 $92 Not Implemented
IA0285 # 04 Y:2002 04 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $39,507 $800 Implemented
IA0285 # 05 Y:2002 05 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $46,580 $320 Implemented
IA0285 # 06 Y:2002 06 2002 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $12,642 $3,424 Implemented
IA0285 # 07 Y:2002 07 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,018 $7,500 Implemented
SU0126 # 01 Y:2002 01 2002 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $195,247 $2,000,000 Not Implemented
SU0126 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $18,512 $3,152 Implemented
SU0126 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,917 $307 Implemented
SU0126 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,232 $1,710 Not Implemented
SU0126 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $777 $0 Not Implemented
SD0287 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,881 $1,440 Implemented
SD0287 # 02 Y:2002 02 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $51,269 $35,000 Not Implemented
SD0287 # 03 Y:2002 03 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $27,450 $20,000 Not Implemented
SD0287 # 04 Y:2002 04 2002 USE POWER DURING OFF-PEAK PERIODS $30,695 $0 Implemented
SD0287 # 05 Y:2002 05 2002 INSTALL SKYLIGHTS $41,280 $31,500 Not Implemented
SD0287 # 06 Y:2002 06 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $13,283 $3,000 Not Implemented
SD0287 # 07 Y:2002 07 2002 INSTALL OCCUPANCY SENSORS $3,635 $2,800 Implemented
SD0287 # 08 Y:2002 08 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $20,169 $2,500 Not Implemented
SD0287 # 09 Y:2002 09 2002 USE EVAPORATION TO CONCENTRATE MATERIAL $6,810 $3,000 Not Implemented
SD0287 # 10 Y:2002 10 2002 USE EVAPORATION TO CONCENTRATE MATERIAL $825 $1,500 Not Implemented
SD0287 # 11 Y:2002 11 2002 INSTALL EQUIPMENT TO MOVE PRODUCT $80,784 $100,000 Not Implemented
LM0023 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,237 $500 Implemented
LM0023 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,782 $2,200 Not Implemented
LM0023 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,630 $5,105 Not Implemented