Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,620
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0618 # 07 Y:2001 | 07 | 2001 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $4,522 | $3,000 | Not Implemented |
UD0618 # 08 Y:2001 | 08 | 2001 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $3,394 | $0 | Not Implemented |
UD0618 # 09 Y:2001 | 09 | 2001 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $1,779 | $5,000 | Not Implemented |
UD0618 # 10 Y:2001 | 10 | 2001 | METER WASTE WATER | $1,284 | $500 | Not Implemented |
UD0617 # 01 Y:2001 | 01 | 2001 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $90,000 | $111,000 | Implemented |
UD0617 # 02 Y:2001 | 02 | 2001 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $98,016 | $60,000 | Implemented |
UD0617 # 03 Y:2001 | 03 | 2001 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $20,174 | $3,131 | Not Implemented |
UD0617 # 04 Y:2001 | 04 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,875 | $0 | Not Implemented |
UD0617 # 05 Y:2001 | 05 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,578 | $695 | Implemented |
UD0617 # 06 Y:2001 | 06 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,273 | $260 | Not Implemented |
UD0617 # 07 Y:2001 | 07 | 2001 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,073 | $0 | Not Implemented |
UD0613 # 01 Y:2001 | 01 | 2001 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $21,501 | $15,000 | Not Implemented |
UD0613 # 02 Y:2001 | 02 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $15,606 | $14,000 | Implemented |
UD0613 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,566 | $0 | Implemented |
UD0613 # 04 Y:2001 | 04 | 2001 | USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) | $5,513 | $5,000 | Implemented |
UD0613 # 05 Y:2001 | 05 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,342 | $0 | Implemented |
UD0596 # 01 Y:2000 | 01 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $33,230 | $60,000 | Not Implemented |
UD0596 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,200 | $27,423 | Implemented |
UD0596 # 03 Y:2000 | 03 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,221 | $1,200 | Implemented |
UD0596 # 04 Y:2000 | 04 | 2000 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $3,651 | $1,298 | Not Implemented |
UD0596 # 05 Y:2000 | 05 | 2000 | INSTALL TIMERS AND/OR THERMOSTATS | $2,699 | $3,072 | Not Implemented |
WV0187 # 01 Y:2000 | 01 | 2000 | INSULATE BARE EQUIPMENT | $60,258 | $11,500 | Not Implemented |
WV0187 # 02 Y:2000 | 02 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,150 | $50 | Implemented |
WV0187 # 03 Y:2000 | 03 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,205 | $134 | Not Implemented |
WV0187 # 04 Y:2000 | 04 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $427 | $100 | Implemented |