IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,775

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0110 # 03 Y:2001 03 2001 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $1,628 $500 Implemented
LE0110 # 04 Y:2001 04 2001 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,500 $0 Implemented
LE0110 # 05 Y:2001 05 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $985 $1,350 Not Implemented
LE0110 # 06 Y:2001 06 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $549 $0 Not Implemented
AS0301 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,381 $2,549 Not Implemented
AS0301 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,767 $5,107 Not Implemented
AS0301 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $388 $388 Not Implemented
AS0301 # 04 Y:2001 04 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,032 $110 Implemented
AS0301 # 05 Y:2001 05 2001 MODIFY STARTUP/SHUTDOWN TIMES $48,788 $383 Not Implemented
SD0283 # 01 Y:2001 01 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,925 $144,000 Not Implemented
SD0283 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,393 $480 Implemented
SD0283 # 03 Y:2001 03 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,243 $6,000 Not Implemented
SD0283 # 04 Y:2001 04 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,566 $5,950 Not Implemented
SD0283 # 05 Y:2001 05 2001 INSTALL SKYLIGHTS $9,916 $28,500 Not Implemented
SD0283 # 06 Y:2001 06 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $17,992 $2,300 Implemented
SD0283 # 07 Y:2001 07 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $9,044 $18,000 Implemented
SD0283 # 08 Y:2001 08 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $476,943 $325,000 Not Implemented
SD0283 # 09 Y:2001 09 2001 INSTALL CONTINUOUS LUBRICATION EQUIPMENT $385,010 $152,000 Not Implemented
SD0283 # 10 Y:2001 10 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $2,622,000 $180,000 Not Implemented
SD0283 # 11 Y:2001 11 2001 INSTALL BACK-UP EQUIPMENT $110,362 $400,000 Not Implemented
UU0005 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,950 $280 Implemented
UU0005 # 02 Y:2001 02 2001 OPTIMIZE PLANT POWER FACTOR $798 $932 Implemented
UU0005 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,396 $300 Not Implemented
UU0005 # 04 Y:2001 04 2001 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,070 $10,000 Not Implemented
UU0005 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $612 $1,575 Not Implemented