IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,139

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0372 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,065 $210 Implemented
AM0372 # 05 Y:2000 05 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,592 $150 Implemented
AM0372 # 06 Y:2000 06 2000 INSTALL SKYLIGHTS $1,300 $5,520 Not Implemented
AM0372 # 07 Y:2000 07 2000 USE OPTIMUM THICKNESS INSULATION $940 $734 Not Implemented
AM0372 # 08 Y:2000 08 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $585 $0 Implemented
AM0372 # 09 Y:2000 09 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $585 $0 Implemented
AM0372 # 10 Y:2000 10 2000 INSTALL OCCUPANCY SENSORS $470 $210 Implemented
AM0372 # 11 Y:2000 11 2000 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $315 $0 Implemented
SD0245 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $15,319 $14,000 Not Implemented
SD0245 # 02 Y:2000 02 2000 INSULATE BARE EQUIPMENT $7,454 $5,833 Not Implemented
SD0245 # 03 Y:2000 03 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,787 $2,500 Implemented
SD0245 # 04 Y:2000 04 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,523 $4,000 Not Implemented
SD0245 # 05 Y:2000 05 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,081 $3,000 Not Implemented
SD0245 # 06 Y:2000 06 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $905 $900 Not Implemented
SD0245 # 07 Y:2000 07 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $515 $0 Implemented
SD0245 # 08 Y:2000 08 2000 INSTALL BACK-UP EQUIPMENT $6,118 $7,000 Not Implemented
UM0161 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,365 $450 Implemented
UM0161 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,614 $500 Not Implemented
UM0161 # 03 Y:2000 03 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $48,437 $500 Implemented
UM0161 # 04 Y:2000 04 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,098 $656 Not Implemented
UM0161 # 05 Y:2000 05 2000 UPGRADE OBSOLETE EQUIPMENT $5,016 $5,700 Not Implemented
SD0238 # 01 Y:2000 01 2000 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $21,910 $10,250 Implemented
SD0238 # 02 Y:2000 02 2000 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $13,294 $11,825 Implemented
SD0238 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $838 $1,880 Implemented
SD0238 # 04 Y:2000 04 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $171,427 $100,000 Not Implemented