IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,775

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0483 # 03 Y:2001 03 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,200 $11,000 Not Implemented
MA0483 # 04 Y:2001 04 2001 INSULATE BARE EQUIPMENT $2,250 $12,000 Not Implemented
MA0483 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,650 $800 Implemented
MA0483 # 06 Y:2001 06 2001 USE RADIANT HEATER FOR SPOT HEATING $1,050 $6,000 Not Implemented
MA0483 # 07 Y:2001 07 2001 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $570 $2,500 Implemented
SF0213 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,492 $0 Implemented
SF0213 # 02 Y:2001 02 2001 INSULATE BARE EQUIPMENT $19,198 $3,152 Not Implemented
SF0213 # 03 Y:2001 03 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,282 $950 Not Implemented
SF0213 # 04 Y:2001 04 2001 INSTALL OCCUPANCY SENSORS $106 $120 Implemented
SF0213 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $312 $1,113 Implemented
SF0213 # 06 Y:2001 06 2001 RECOVER WASTE HEAT FROM EQUIPMENT $13,159 $55,000 Not Implemented
SF0213 # 07 Y:2001 07 2001 RECOVER AND REUSE WASTE MATERIAL $105,153 $107,153 Not Implemented
UD0613 # 01 Y:2001 01 2001 REPLACE TREATED WATER WITH WELL / SURFACE WATER $21,501 $15,000 Not Implemented
UD0613 # 02 Y:2001 02 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $15,606 $14,000 Implemented
UD0613 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,566 $0 Implemented
UD0613 # 04 Y:2001 04 2001 USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) $5,513 $5,000 Implemented
UD0613 # 05 Y:2001 05 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,342 $0 Implemented
LE0101 # 01 Y:2001 01 2001 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $9,696 $500 Implemented
LE0101 # 02 Y:2001 02 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $26,225 $30,000 Implemented
LE0101 # 03 Y:2001 03 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $78,362 $2,500 Implemented
LE0101 # 04 Y:2001 04 2001 IMPROVE LUBRICATION PRACTICES $3,752 $800 Implemented
LE0101 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $89,879 $0 Implemented
LE0101 # 06 Y:2001 06 2001 CLOSE OFF UNNEEDED STEAM LINES $3,984 $2,000 Implemented
LE0101 # 07 Y:2001 07 2001 USE OPTIMUM THICKNESS INSULATION $5,167 $2,000 Implemented
AM0389 # 01 Y:2001 01 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $97,950 $233,444 n/a