IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,775

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0212 # 09 Y:1999 09 1999 MOVE PRODUCT USING MECHANICAL MEANS $4,590 $12,000 Not Implemented
HO0212 # 10 Y:1999 10 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $6,379 $500 Implemented
MO0264 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,289 $62 Not Implemented
MO0264 # 02 Y:1999 02 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,752 $40 Not Implemented
MO0264 # 03 Y:1999 03 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $949 $1,518 Implemented
MO0264 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $960 $300 Implemented
MO0264 # 05 Y:1999 05 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,600 $0 Implemented
MO0264 # 06 Y:1999 06 1999 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $8,000 $2,000 Not Implemented
MO0264 # 07 Y:1999 07 1999 MODIFY CURRENT INCENTIVE PROGRAM $4,000 $700 Not Implemented
IA0236 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,665 $16,153 Not Implemented
IA0236 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,409 $1,248 Not Implemented
IA0236 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,131 $394 Not Implemented
IA0236 # 04 Y:1999 04 1999 INSTALL OCCUPANCY SENSORS $455 $200 Not Implemented
IA0236 # 05 Y:1999 05 1999 RECYCLE CLEANING SOLVENT AND REUSE $8,966 $7,853 Not Implemented
UM0149 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $836 $500 Implemented
UM0149 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $618 $200 Implemented
UM0149 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $2,322 $1,500 Not Implemented
UM0149 # 04 Y:1999 04 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,107 $10,500 Not Implemented
UM0149 # 05 Y:1999 05 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,804 $0 Not Implemented
UM0149 # 06 Y:1999 06 1999 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $8,500 $40,000 Implemented
UM0149 # 07 Y:1999 07 1999 EXPAND OPERATIONS INTO UNUSED SPACE $357,000 $714,000 Not Implemented
UD0580 # 01 Y:1999 01 1999 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $862,392 $1,300,000 Not Implemented
UD0580 # 02 Y:1999 02 1999 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $134,400 $400,000 Not Implemented
UD0580 # 03 Y:1999 03 1999 RECOVER AND REUSE COOLING WATER $52,000 $140,000 Not Implemented
UD0580 # 04 Y:1999 04 1999 MOVE PRODUCT USING MECHANICAL MEANS $39,393 $10,000 Not Implemented