Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
415
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0634 # 06 Y:2008 | 06 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $498 | $500 | Implemented |
MA0606 # 10 Y:2006 | 10 | 2006 | USE OPTIMUM TEMPERATURE | $79,097 | $21,125 | Not Implemented |
MA0606 # 11 Y:2006 | 11 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $47,776 | $27,573 | Not Implemented |
MA0606 # 12 Y:2006 | 12 | 2006 | OPTIMIZE PLANT POWER FACTOR | $14,940 | $11,400 | Not Implemented |
MA0606 # 09 Y:2006 | 09 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $95,360 | $195,000 | Not Implemented |
MA0606 # 08 Y:2006 | 08 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $130,688 | $6,000 | Implemented |
MA0606 # 07 Y:2006 | 07 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $132,608 | $196,800 | Not Implemented |
MA0606 # 06 Y:2006 | 06 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $89,232 | $165,000 | Not Implemented |
MA0606 # 05 Y:2006 | 05 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $169,598 | $120,520 | Not Implemented |
MA0606 # 04 Y:2006 | 04 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $285,051 | $60,000 | Not Implemented |
MA0606 # 03 Y:2006 | 03 | 2006 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $55,708 | $2,000 | Not Implemented |
MA0606 # 02 Y:2006 | 02 | 2006 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $298,083 | $2,000 | Not Implemented |
MA0606 # 01 Y:2006 | 01 | 2006 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $617,366 | $36,000 | Not Implemented |
MA0597 # 08 Y:2006 | 08 | 2006 | INSTALL OCCUPANCY SENSORS | $909 | $775 | Not Implemented |
MA0597 # 07 Y:2006 | 07 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,402 | $0 | Implemented |
MA0597 # 06 Y:2006 | 06 | 2006 | INSULATE BARE EQUIPMENT | $2,161 | $668 | Implemented |
MA0597 # 05 Y:2006 | 05 | 2006 | INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT | $3,292 | $19,000 | Not Implemented |
MA0597 # 04 Y:2006 | 04 | 2006 | REDUCE VENTILATION AIR | $4,902 | $1,000 | Implemented |
MA0597 # 03 Y:2006 | 03 | 2006 | INSULATE BARE EQUIPMENT | $5,643 | $17,818 | Implemented |
MA0597 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,984 | $17,660 | Implemented |
MA0597 # 01 Y:2006 | 01 | 2006 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $25,107 | $85,300 | Not Implemented |
MA0568 # 06 Y:2005 | 06 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,459 | $2,888 | Not Implemented |
MA0568 # 05 Y:2005 | 05 | 2005 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $4,092 | $6,000 | Implemented |
MA0568 # 04 Y:2005 | 04 | 2005 | OPTIMIZE PLANT POWER FACTOR | $5,122 | $6,750 | Implemented |
MA0568 # 03 Y:2005 | 03 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,788 | $12,000 | Implemented |