Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
579
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0514 # 02 Y:2022 | 02 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $22,430 | $675 | Not Implemented |
SU0514 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,219 | $1,953 | Not Implemented |
SU0514 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $46 | $49 | Not Implemented |
SU0514 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,996 | $9,943 | Not Implemented |
LE0497 # 06 Y:2020 | 06 | 2020 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $3,520 | $13,000 | Not Implemented |
LE0497 # 05 Y:2020 | 05 | 2020 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $1,765 | $4,600 | Not Implemented |
LE0497 # 04 Y:2020 | 04 | 2020 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $2,905 | $5,000 | Not Implemented |
LE0497 # 03 Y:2020 | 03 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $21,231 | $32,000 | Not Implemented |
LE0497 # 02 Y:2020 | 02 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $13,727 | $10,000 | Not Implemented |
LE0497 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,793 | $4,200 | Not Implemented |
SU0495 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,111 | $36,548 | Not Implemented |
SU0495 # 06 Y:2020 | 06 | 2020 | ELIMINATE/REDUCE AN OPERATION | $4,106 | $7,548 | Not Implemented |
SU0495 # 05 Y:2020 | 05 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $765 | $1,343 | Not Implemented |
SU0495 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $424 | $436 | Not Implemented |
SU0495 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $756 | $547 | Not Implemented |
SU0495 # 02 Y:2020 | 02 | 2020 | REDUCE VENTILATION AIR | $2,795 | $917 | Not Implemented |
SU0495 # 01 Y:2020 | 01 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $703 | $55 | Not Implemented |
SU0484 # 02 Y:2019 | 02 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $370 | $157 | Implemented |
SU0484 # 01 Y:2019 | 01 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $150 | $14 | Not Implemented |
SU0484 # 03 Y:2019 | 03 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $22,670 | $15,784 | Not Implemented |
SU0484 # 04 Y:2019 | 04 | 2019 | REPLACE BOILER | $168,017 | $185,420 | Not Implemented |
SU0484 # 06 Y:2019 | 06 | 2019 | REDUCE VENTILATION AIR | $514 | $929 | Implemented |
SU0484 # 07 Y:2019 | 07 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,516 | $4,046 | Implemented |
SU0484 # 08 Y:2019 | 08 | 2019 | INSTALL OCCUPANCY SENSORS | $69 | $30 | Implemented |
SU0484 # 05 Y:2019 | 05 | 2019 | INSTALL / REPAIR INSULATION ON STEAM LINES | $236 | $318 | Implemented |