Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,139

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0148 # 03 Y:1998 03 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,475 $0 Not Implemented
AR0148 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,792 $850 Not Implemented
AR0148 # 05 Y:1998 05 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $40,673 $1,200 Implemented
AR0148 # 06 Y:1998 06 1998 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $39,295 $91,825 Implemented
AR0148 # 07 Y:1998 07 1998 DISTILL CONTAMINATED SOLVENTS FOR REUSE $3,600 $6,000 Not Implemented
AR0148 # 08 Y:1998 08 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $4,787 $1,000 Implemented
AR0148 # 09 Y:1998 09 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $4,143 $0 Not Implemented
MO0236 # 01 Y:1998 01 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,048 $2,700 Not Implemented
MO0236 # 02 Y:1998 02 1998 CHANGE OPERATING CONDITIONS $553 $380 Implemented
MO0236 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,270 $1,717 Implemented
MO0236 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $930 $232 Not Implemented
MO0236 # 05 Y:1998 05 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,639 $2,805 Implemented
MO0236 # 06 Y:1998 06 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $206 $0 Implemented
MO0236 # 07 Y:1998 07 1998 RECOVER AND REUSE WASTE MATERIAL $49,600 $15,000 Implemented
MO0236 # 08 Y:1998 08 1998 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $3,864 $10,000 Not Implemented
OR0322 # 01 Y:1998 01 1998 REDUCE SCRAP PRODUCTION $22,000 $12,480 Implemented
OR0322 # 02 Y:1998 02 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $1,960 $180 Not Implemented
OR0322 # 03 Y:1998 03 1998 OPTIMIZE PLANT POWER FACTOR $3,399 $5,800 Not Implemented
OR0322 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,116 $1,000 Not Implemented
AS0232 # 01 Y:1998 01 1998 INSTALL OCCUPANCY SENSORS $528 $750 Not Implemented
AS0232 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,829 $20,012 Implemented
AS0232 # 03 Y:1998 03 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $141,064 $100,000 Not Implemented
AS0232 # 04 Y:1998 04 1998 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,577 $785 Implemented
AS0232 # 05 Y:1998 05 1998 UPGRADE CONVEYORS $3,611 $10,240 Not Implemented
AS0232 # 06 Y:1998 06 1998 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $14,269 $9,500 Not Implemented