IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,139

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0642 # 01 Y:1998 01 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $177,600 $510,000 Implemented
TN0642 # 02 Y:1998 02 1998 MODIFY CURRENT INCENTIVE PROGRAM $81,550 $16,885 Implemented
TN0642 # 03 Y:1998 03 1998 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $45,000 $26,000 Not Implemented
TN0642 # 04 Y:1998 04 1998 REDUCE SCRAP PRODUCTION $33,515 $24,000 Implemented
TN0642 # 05 Y:1998 05 1998 REUSE / RECYCLE/ SELL PAPER PRODUCTS $2,130 $1,200 Not Implemented
TN0642 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $660 $2,190 Implemented
TN0642 # 07 Y:1998 07 1998 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $300 $0 Implemented
TN0642 # 08 Y:1998 08 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $230 $500 Implemented
TN0642 # 09 Y:1998 09 1998 USE SYNTHETIC LUBRICANT $150 $0 Implemented
UM0120 # 01 Y:1998 01 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,335 $250 Not Implemented
UM0120 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,860 $1,000 Implemented
UM0120 # 03 Y:1998 03 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,029 $1,000 Implemented
UM0120 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,783 $100 Implemented
UM0120 # 05 Y:1998 05 1998 RECOVER WASTE HEAT FROM EQUIPMENT $962 $1,500 Not Implemented
UM0120 # 06 Y:1998 06 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $14,994 $5,000 Not Implemented
UM0120 # 07 Y:1998 07 1998 IMPROVE SPACE COMFORT CONDITIONING $1,440 $518 Implemented
HO0186 # 01 Y:1998 01 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $268 $0 Implemented
HO0186 # 02 Y:1998 02 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,988 $0 Implemented
HO0186 # 03 Y:1998 03 1998 USE RADIANT HEATER FOR SPOT HEATING $6,903 $6,000 Not Implemented
HO0186 # 04 Y:1998 04 1998 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,873 $3,000 Implemented
HO0186 # 05 Y:1998 05 1998 INSTALL TIMERS AND/OR THERMOSTATS $11,162 $5,000 Implemented
HO0186 # 06 Y:1998 06 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $3,900 $1,000 Implemented
KU0498 # 01 Y:1998 01 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,010 $4,150 Not Implemented
KU0498 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,610 $650 Implemented
KU0498 # 03 Y:1998 03 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $560 $570 Implemented