IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,133

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0206 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,393 $2,503 Not Implemented
AS0206 # 04 Y:1997 04 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,124 $225 Not Implemented
AS0206 # 05 Y:1997 05 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $377 $60 Implemented
AS0206 # 06 Y:1997 06 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,352 $30 Implemented
AS0206 # 07 Y:1997 07 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,760 $0 Not Implemented
AS0206 # 08 Y:1997 08 1997 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $12,000 $100 Not Implemented
UM0090 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,096 $1,755 Implemented
UM0090 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,710 $4,546 Implemented
UM0090 # 03 Y:1997 03 1997 INSTALL OCCUPANCY SENSORS $113 $200 Not Implemented
UM0090 # 04 Y:1997 04 1997 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,141 $2,000 Implemented
UM0090 # 05 Y:1997 05 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $5,250 $0 Implemented
UM0090 # 06 Y:1997 06 1997 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $19,843 $14,648 Not Implemented
OK0526 # 01 Y:1997 01 1997 ELIMINATE SHIFT $17,788 $6,950 Not Implemented
OK0526 # 02 Y:1997 02 1997 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $5,426 $11,087 Implemented
OK0526 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,291 $3,370 Implemented
OK0526 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,086 $2,477 Implemented
OK0526 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,323 $4,055 Implemented
OK0526 # 06 Y:1997 06 1997 INSULATE BARE EQUIPMENT $275 $363 Implemented
NC0116 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,301 $690 Implemented
NC0116 # 02 Y:1997 02 1997 INSULATE BARE EQUIPMENT $2,743 $188 Implemented
NC0116 # 03 Y:1997 03 1997 USE OPTIMUM THICKNESS INSULATION $6,052 $447 Implemented
NC0116 # 04 Y:1997 04 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,450 $480 Not Implemented
NC0116 # 05 Y:1997 05 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $13,840 $1,350 Not Implemented
NC0116 # 06 Y:1997 06 1997 MOVE PRODUCT USING MECHANICAL MEANS $101 $250 Not Implemented
NC0114 # 01 Y:1997 01 1997 COVER OPEN TANKS $359 $195 Not Implemented