IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

440

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0220 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $298 $450 Not Implemented
LE0220 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,210 $25,315 Implemented
LE0186 # 01 Y:2004 01 2004 USE OPTIMUM THICKNESS INSULATION $12,188 $16,273 Not Implemented
LE0186 # 02 Y:2004 02 2004 USE OPTIMUM THICKNESS INSULATION $8,974 $7,000 Not Implemented
LE0186 # 03 Y:2004 03 2004 OPTIMIZE PLANT POWER FACTOR $3,293 $3,800 Not Implemented
LE0186 # 04 Y:2004 04 2004 USE OPTIMUM THICKNESS INSULATION $2,885 $641 Not Implemented
LE0186 # 05 Y:2004 05 2004 REPAIR OR REPLACE STEAM TRAPS $1,428 $600 Implemented
LE0186 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $773 $200 Implemented
LE0186 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $405 $0 Implemented
LE0186 # 08 Y:2004 08 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $340 $0 Not Implemented
LE0186 # 09 Y:2004 09 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $221 $0 Implemented
LE0186 # 10 Y:2004 10 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,232 $0 Implemented
LE0186 # 11 Y:2004 11 2004 INSTALL OCCUPANCY SENSORS $354 $0 Implemented
LE0170 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $210,423 $300,000 Not Implemented
LE0170 # 02 Y:2003 02 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,647 $7,000 Implemented
LE0170 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $952 $0 Implemented
LE0170 # 04 Y:2003 04 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $367 $0 Implemented
LE0170 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $440 $560 Not Implemented
LE0170 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $425 $825 Not Implemented
LE0140 # 01 Y:2002 01 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,395 $1,000 Not Implemented
LE0140 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,492 $0 Not Implemented
LE0140 # 03 Y:2002 03 2002 OPTIMIZE PLANT POWER FACTOR $13,648 $33,900 Not Implemented
LE0140 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,017 $100 Not Implemented
LE0140 # 05 Y:2002 05 2002 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $10,644 $20,000 Not Implemented
LE0101 # 01 Y:2001 01 2001 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $9,696 $500 Implemented