IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

625

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0066 # 05 Y:2003 05 2003 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,238 $60 Implemented
MI0066 # 06 Y:2003 06 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,117 $17,250 Not Implemented
MI0066 # 07 Y:2003 07 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,490 $175 Not Implemented
MI0066 # 08 Y:2003 08 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $729 $33 Implemented
MI0066 # 09 Y:2003 09 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $217 $220 Implemented
UD0679 # 01 Y:2003 01 2003 REDUCE VENTILATION AIR $241,706 $-3,800,000 n/a
UD0679 # 02 Y:2003 02 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $52,385 $1,125 n/a
UD0679 # 03 Y:2003 03 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $12,046 $270 n/a
UD0679 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,330 $1,100 n/a
UD0679 # 05 Y:2003 05 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,465 $200 n/a
UD0679 # 06 Y:2003 06 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $7,398 $0 n/a
UD0679 # 07 Y:2003 07 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,070 $7,100 n/a
UD0679 # 08 Y:2003 08 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,200 $1,750 n/a
UD0679 # 09 Y:2003 09 2003 DISCONNECT BALLASTS $3,797 $132 n/a
UD0679 # 10 Y:2003 10 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,739 $3,618 n/a
UD0679 # 11 Y:2003 11 2003 INSTALL OCCUPANCY SENSORS $232 $110 n/a
LE0170 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $210,423 $300,000 Not Implemented
LE0170 # 02 Y:2003 02 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,647 $7,000 Implemented
LE0170 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $952 $0 Implemented
LE0170 # 04 Y:2003 04 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $367 $0 Implemented
LE0170 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $440 $560 Not Implemented
LE0170 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $425 $825 Not Implemented
SU0165 # 01 Y:2003 01 2003 $99,450 $110,400 Implemented
SU0165 # 02 Y:2003 02 2003 RECOVER AND REUSE SPENT ACID BATHS $30,138 $3,234 Implemented
SU0165 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,370 $17,064 Implemented