Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
415
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0530 # 07 Y:2003 | 07 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,661 | $400 | Implemented |
MA0530 # 08 Y:2003 | 08 | 2003 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $8,213 | $26,700 | Not Implemented |
MA0530 # 09 Y:2003 | 09 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,271 | $2,750 | Implemented |
MA0530 # 10 Y:2003 | 10 | 2003 | PAY BILLS ON TIME TO AVOID LATE FEES | $692 | $1,275 | Implemented |
MA0492 # 01 Y:2001 | 01 | 2001 | USE EVAPORATION TO CONCENTRATE MATERIAL | $23,000 | $10,000 | Not Implemented |
MA0492 # 02 Y:2001 | 02 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,800 | $360 | Implemented |
MA0492 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,800 | $15,000 | Not Implemented |
MA0492 # 04 Y:2001 | 04 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,160 | $12,000 | Not Implemented |
MA0492 # 05 Y:2001 | 05 | 2001 | INSTALL OCCUPANCY SENSORS | $480 | $200 | Implemented |
MA0483 # 01 Y:2001 | 01 | 2001 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $8,700 | $0 | Implemented |
MA0483 # 02 Y:2001 | 02 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,400 | $14,000 | Not Implemented |
MA0483 # 03 Y:2001 | 03 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,200 | $11,000 | Not Implemented |
MA0483 # 04 Y:2001 | 04 | 2001 | INSULATE BARE EQUIPMENT | $2,250 | $12,000 | Not Implemented |
MA0483 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,650 | $800 | Implemented |
MA0483 # 06 Y:2001 | 06 | 2001 | USE RADIANT HEATER FOR SPOT HEATING | $1,050 | $6,000 | Not Implemented |
MA0483 # 07 Y:2001 | 07 | 2001 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $570 | $2,500 | Implemented |
MA0474 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,827 | $1,000 | Implemented |
MA0474 # 02 Y:2000 | 02 | 2000 | INSTALL TIMERS AND/OR THERMOSTATS | $4,760 | $0 | Implemented |
MA0474 # 03 Y:2000 | 03 | 2000 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $2,838 | $13,000 | Not Implemented |
MA0474 # 04 Y:2000 | 04 | 2000 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $746 | $4,000 | Not Implemented |
MA0474 # 05 Y:2000 | 05 | 2000 | INSTALL OCCUPANCY SENSORS | $512 | $1,000 | Implemented |
MA0474 # 06 Y:2000 | 06 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $371 | $100 | Implemented |
MA0470 # 01 Y:2000 | 01 | 2000 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $4,970 | $500 | Implemented |
MA0470 # 02 Y:2000 | 02 | 2000 | USE RADIANT HEATER FOR SPOT HEATING | $3,064 | $12,000 | Not Implemented |
MA0470 # 03 Y:2000 | 03 | 2000 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,099 | $4,500 | Not Implemented |