IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0321 # 01 Y:1990 01 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $39,907 $25,000 Implemented
OK0321 # 02 Y:1990 02 1990 RECOVER WASTE HEAT FROM EQUIPMENT $8,220 $2,876 Implemented
OK0321 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,356 $19,970 Not Implemented
OK0321 # 04 Y:1990 04 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $451 $502 Not Implemented
OK0321 # 05 Y:1990 05 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $102 $0 Implemented
RU0100 # 01 Y:1990 01 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $410 $0 Implemented
RU0100 # 02 Y:1990 02 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $431 $419 Implemented
RU0100 # 03 Y:1990 03 1990 INSULATE BARE EQUIPMENT $3,924 $5,255 Implemented
RU0100 # 04 Y:1990 04 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,447 $0 Implemented
RU0100 # 05 Y:1990 05 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,300 $239 Implemented
RU0101 # 01 Y:1990 01 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $976 $0 Implemented
RU0101 # 02 Y:1990 02 1990 COVER OPEN TANKS $16,298 $1,468 Not Implemented
RU0101 # 03 Y:1990 03 1990 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $34,441 $74,800 Implemented
RU0101 # 04 Y:1990 04 1990 INSTALL STORM WINDOWS AND DOORS $545 $750 Implemented
WI0098 # 01 Y:1990 01 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $317 $500 Not Implemented
WI0098 # 02 Y:1990 02 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,226 $8,680 Implemented
WI0098 # 03 Y:1990 03 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $634 $1,350 Implemented
WI0098 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,208 $1,224 Implemented
WI0098 # 05 Y:1990 05 1990 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,605 $0 Implemented
WI0098 # 06 Y:1990 06 1990 INSTALL SET-BACK TIMERS $1,304 $1,000 Not Implemented
WI0098 # 07 Y:1990 07 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,254 $0 Not Implemented
WI0098 # 08 Y:1990 08 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,065 $750 Not Implemented
WI0098 # 09 Y:1990 09 1990 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,274 $500 Not Implemented
WI0098 # 10 Y:1990 10 1990 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $342 $509 Not Implemented
WI0098 # 11 Y:1990 11 1990 SHUT OFF PILOTS IN STANDBY EQUIPMENT $88 $0 Implemented