IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LT0050 # 02 Y:1985 02 1985 COVER OPEN TANKS $351 $154 Not Implemented
LT0050 # 03 Y:1985 03 1985 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $929 $2,700 Implemented
MA0045 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $787 $450 Implemented
MA0045 # 02 Y:1985 02 1985 RECOVER WASTE HEAT FROM EQUIPMENT $756 $750 Implemented
MA0045 # 03 Y:1985 03 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,100 $5,110 Not Implemented
MA0045 # 04 Y:1985 04 1985 INSULATE BARE EQUIPMENT $1,515 $2,816 Not Implemented
MA0045 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $4,896 $7,546 Not Implemented
MA0045 # 06 Y:1985 06 1985 REPAIR OR REPLACE STEAM TRAPS $661 $500 Implemented
MA0045 # 07 Y:1985 07 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $573 $11 Implemented
MA0045 # 08 Y:1985 08 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $546 $1,329 Not Implemented
MA0045 # 09 Y:1985 09 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $845 $1,100 Implemented
ST0046 # 01 Y:1985 01 1985 IMPROVE LUBRICATION PRACTICES $1,340 $0 Not Implemented
ST0046 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,472 $1,038 Implemented
ST0046 # 03 Y:1985 03 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,093 $1,900 Not Implemented
ST0046 # 04 Y:1985 04 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $280 $412 Implemented
ST0046 # 05 Y:1985 05 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $618 $706 Not Implemented
ST0046 # 06 Y:1985 06 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,455 $128 Implemented
ST0046 # 07 Y:1985 07 1985 USE COMPRESSOR AIR FILTERS $403 $0 Implemented
ST0046 # 08 Y:1985 08 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $214 $100 Implemented
ST0046 # 09 Y:1985 09 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $233 $0 Not Implemented
ST0046 # 10 Y:1985 10 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,410 $560 Not Implemented
ST0047 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,895 $16,240 Implemented
ST0047 # 02 Y:1985 02 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $294 $150 Not Implemented
ST0047 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,188 $120 Implemented
ST0047 # 04 Y:1985 04 1985 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,095 $1,200 Not Implemented