Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
109
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0751 # 02 Y:2022 | 02 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,956 | $1,175 | Not Implemented |
OR0751 # 01 Y:2022 | 01 | 2022 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $12,526 | $140 | Not Implemented |
OR0751 # 04 Y:2022 | 04 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,125 | $1,272 | Not Implemented |
OR0751 # 03 Y:2022 | 03 | 2022 | FILTER AND REUSE HYDRAULIC OIL | $74,774 | $48,589 | Not Implemented |
OR0692 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,299 | $3,670 | Not Implemented |
OR0692 # 01 Y:2017 | 01 | 2017 | REDUCE FLUID FLOW RATES | $26,801 | $7,395 | Not Implemented |
OR0692 # 02 Y:2017 | 02 | 2017 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,636 | $3,060 | Not Implemented |
OR0677 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,583 | $22,256 | Not Implemented |
OR0677 # 03 Y:2016 | 03 | 2016 | REPLACE BOILER | $4,164 | $17,322 | Not Implemented |
OR0677 # 06 Y:2016 | 06 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,207 | $944 | Not Implemented |
OR0677 # 01 Y:2016 | 01 | 2016 | INSULATE BARE EQUIPMENT | $7,372 | $5,408 | Implemented |
OR0677 # 05 Y:2016 | 05 | 2016 | INSULATE BARE EQUIPMENT | $2,064 | $658 | Implemented |
OR0677 # 02 Y:2016 | 02 | 2016 | USE OPTIMUM TEMPERATURE | $1,822 | $300 | Not Implemented |
OR0529 # 01 Y:2008 | 01 | 2008 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $8,800 | $4,900 | Not Implemented |
OR0529 # 04 Y:2008 | 04 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,767 | $4,515 | Not Implemented |
OR0529 # 03 Y:2008 | 03 | 2008 | CONTROL PRESSURE ON STEAMER OPERATIONS | $11,760 | $1,000 | Not Implemented |
OR0529 # 02 Y:2008 | 02 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $12,400 | $17,900 | Not Implemented |
OR0522 # 04 Y:2007 | 04 | 2007 | $900 | $3,450 | Not Implemented | |
OR0522 # 02 Y:2007 | 02 | 2007 | $49,400 | $51,300 | Not Implemented | |
OR0522 # 03 Y:2007 | 03 | 2007 | $14,500 | $10,000 | Not Implemented | |
OR0522 # 01 Y:2007 | 01 | 2007 | $70,700 | $200,000 | Not Implemented | |
OR0454 # 01 Y:2004 | 01 | 2004 | REDESIGN PROCESS | $39,560 | $0 | Not Implemented |
OR0454 # 03 Y:2004 | 03 | 2004 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $5,720 | $13,080 | Implemented |
OR0454 # 04 Y:2004 | 04 | 2004 | USE WATER-BASED CUTTING FLUIDS TO ELIMINATE NEED FOR SOLVENT CLEANING | $16,940 | $29,200 | Implemented |
OR0454 # 02 Y:2004 | 02 | 2004 | INSTALL SENSORS TO DETECT DEFECTS | $24,900 | $2,600 | Not Implemented |